Message ID: 855     Entry time: Thursday, February 18, 2021, 16:48
Author: Fernando Maldonado 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Failed 
Subject: FEBIAD parameter scans 

Thursday, February 18, 2021, 15:19: Gas lines roughed and refilled. Gauge reads -50 kPa. Absolute pressure is 50 kPa.

IG1 @ 9.7 e-7 T.

Thursday, February 18, 2021, 15:27: BIAS/EZL/EE @ 30/13/1.5 kV. No sign of instabilities as before. Bias current=0.08 mA.

This also means the leak, in this clean environment is fine.

Thursday, February 18, 2021, 15:28

 

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.25 3.71
 TBHT 22.11

6.16

 COIL + EE 21.94 1.71
 TGHT 22.06 5.02

Slightly drop in flow. Will check later as well.

Thursday, February 18, 2021, 15:37: BIAS/EZL/EE @ 35/13/1.5 kV.

Thursday, February 18, 2021, 15:39. Spark inside. Recover with no problem

Thursday, February 18, 2021, 16:27 : BIAS/EZL/EE @ 40/13/1.5 kV.

Thursday, February 18, 2021, 16:28: Spark

Thursday, February 18, 2021, 16:42:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.16 3.66
 TBHT 21.91

  2.42

 COIL + EE 21.91 1.66
 TGHT 21.8   4.91

 Thursday, February 18, 2021, 17:1: Logging water temperature and flow in the PC.

Thursday, February 18, 2021, 17:19: BIAS/EZL/EE @ 0.000 kV.

Thursday, February 18, 2021, 17:20: Auto-ramping TGHT/TBHT to

Thursday, February 18, 2021, 17:26: Anode is shorted. It seems that the  Ta capillary  is touching the HS. I have to open.

Thursday, February 18, 2021, 17:35: IG1 and turbos off.

 Thursday, February 18, 2021, 18:2: Venting

Thursday, February 18, 2021, 18:42: Gauge reader at the service cap is now at -40 kPa. A 10 kPa incursion over 4 hours.


Friday, February 19, 2021, 11:04: The anode still has a short, returning all previous jumpers. Short present.

Unhooked anode cable can sustain voltage, hence the electric circuit has a short,

Friday, February 19, 2021, 11:48: Target removed. No short on anode-target. However there is no short in the service tray either, the voltage from the anode supply is held with no problem.

Friday, February 19, 2021, 12:41: Only when the tbht is bolted the power supply goes current limited.

Friday, February 19, 2021, 12:44: Source tray can hold anode voltage without drawing any current, as expected.

Friday, February 19, 2021, 12:52: Target legs to HS presents a short. When HS is removed the short is gone. Will try to find the contact point.

Friday, February 19, 2021, 12:56: Suspecting that is the gas line that goes to the back of the TGHT; is too high and touches the HS. Putting and insulator and installing the HS cover. No short.

Removing the insulator there is a short.

Will bend the gas line.

Friday, February 19, 2021, 13:08: Installed the open assembly, and the anode voltage is held in the system without drawing current, as expected.

Friday, February 19, 2021, 13:21: TIS assy re-installed, short is fixed.