Message ID: 913     Entry time: Monday, March 21, 2022, 13:59
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: 3rd mass marker test 

3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There are three thermocouples as follows:

Thermocouple Source tray pins Rack position Target location

TC1

1,2  4,5  ceramic feeder tube
TC2 4,5  1,2  Right side oven
TC3 8,9  6,7  Left side oven

 

Monday, March 21, 2022, 13:55 : Roughing down.

Monday, March 21, 2022, 16:45 : Turbos have been on for a few hours. Starting water.

Monday, March 21, 2022, 17:20 : Only TC1 has to be tested with heating and maybe swapped if it is the wrong way around. Otherwise ready to go.

 

Thursday, March 24, 2022, 10:51 : Ramping up heaters to test thermocouples.


AS:

Monday, April 04, 2022, 09:10: Power locked out. IG1 & Turbo pumps off. HV top cage removed.