Message ID: 916     Entry time: Tuesday, April 05, 2022, 14:01
Author: Aaron Schmidt 
Target/No.#: Test FEBIAD TM2-2022 
Source: LP-FEBIAD 
Station: ITW 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#: 42752-5 
Status:  
Subject: Test FEBIAD & TS operation 

Tuesday, April 05, 2022, 13:57: Roughing. BV1B.

Tuesday, April 05, 2022, 14:04: BV1A on.

Tuesday, April 05, 2022, 14:28: TP1B on.

Tuesday, April 05, 2022, 14:36: TP1A on.

Tuesday, April 05, 2022, 14:46: IG1 on.


Wednesday, April 06, 2022, 07:42: Vacuum @ 2.50e-06T.

Wednesday, April 06, 2022, 07:44: Waterlines opened. Vacuum Remains stable.

Wednesday, April 06, 2022, 07:59: Cage fully closed up. Power/sources on.

Wednesday, April 06, 2022, 08:00: COIL / TGHT / TBHT @ 10 A manually. Check - Ok.

Wednesday, April 06, 2022, 08:02: Anode @ 50V - Ok.

Wednesday, April 06, 2022, 08:04: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Check - Ok.

Wednesday, April 06, 2022, 08:10: BIAS / EE / EZL @ 10 / -1 / 10 kV.

Wednesday, April 06, 2022, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Ok. Vacuum @ 2.39e-06T.

Wednesday, April 06, 2022, 08:46: 1/2 hour. Stable.

Wednesday, April 06, 2022, 08:50: All sources off. PS off. Open Cage.

Wednesday, April 06, 2022, 08:54: Begin cycling source gas control.

Wednesday, April 06, 2022, 08:57: SV5 open.

Wednesday, April 06, 2022, 08:58: SV3 & SV4 open. Vacuum stable @2.32e-06T.

Wednesday, April 06, 2022, 09:02: Cage closed. Sources / PS  on. IV4 open.

Wednesday, April 06, 2022, 09:04: Auto-ramping TGHT / TBHT to 350 / 150 @ 2 A per min.

Wednesday, April 06, 2022, 09:05: Anode @ 50 V. Coil @ 10 A.

Wednesday, April 06, 2022, 09:10: Optics set.

Wednesday, April 06, 2022, 11:37: Gas lines closed. Abort ramping. TGHT / TBHT @ 306 / 150 A. HV lockout. Open cage.

***Gas bottles are not in the old configuration*** No gas.

Wednesday, April 06, 2022, 11:50: Begin Auto-cooling @ 2 A per min.


Thursday, April 07, 2022, 08:13: IG1 off. Turbo pumps off. Power off. 

Thursday, April 07, 2022, 09:17: Venting. 

 

 

Attachment 1: Test_Target_LP-FEBIAD_TM2-2022.docx  551 kB  Uploaded Monday, April 11, 2022, 14:34