Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)
Wednesday, July 04, 2012, 15:33: Started roughing.
Wednesday, July 04, 2012, 15:57 : Started turbos
Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5 |