Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).
Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.
Tuesday, August 30, 2022, 14:00: BV1A open.
Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on.
Wednesday, August 31, 2022, 07:35: TP1 A on.
Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.
Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.
Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T.
Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.
Limit increased on TGHT parameter setup to 5.500e-06T.
Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min.
Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min.
Monday, September 26, 2022, 10:52: Turbo pumps off.
Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged. |