Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 575     Entry time: Tuesday, April 04, 2017, 14:33
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Power supply failure to E-rig 

Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.


Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.

Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.

It has been determined, due to the damage shown in the uploaded pictures, that theis power supply will need replacing.
Attachment 1: 20170330_094009.jpg  1.832 MB  Uploaded Friday, April 07, 2017, 14:29  | Show | Hide all
Attachment 2: 20170330_094019.jpg  1.062 MB  Uploaded Friday, April 07, 2017, 14:29  | Show | Hide all
Attachment 3: 20170407_115355.jpg  1010 kB  Uploaded Friday, April 07, 2017, 14:30  | Show | Hide all
Attachment 4: 20170407_115223.jpg  1.871 MB  Uploaded Friday, April 07, 2017, 14:30  | Show | Hide all
Attachment 5: 20170407_115414.jpg  969 kB  Uploaded Friday, April 07, 2017, 14:30  | Show | Hide all
ELOG V2.9.2-2455