Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 84     Entry time: Monday, May 14, 2012, 16:57
Author: Aurelia Laxdal 
Target/No.#:  
Source:  
Station: ITE 
Module: TM4 
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: SiC#27-HP-SIS installed in the Test Stand 

Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down.

ELOG V2.9.2-2455