Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
Test-Stand
Not logged in
List
Message ID:
84
Entry time:
Monday, May 14, 2012, 16:57
Author:
Aurelia Laxdal
Target/No.#:
Source:
Station:
ITE
Module:
TM4
Target Oven W.O#:
Heat Shield W.O#:
Status:
Subject:
SiC#27-HP-SIS installed in the Test Stand
Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down.
ELOG V2.9.2-2455