Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 547     Entry time: Tuesday, October 18, 2016, 13:29
Author: Aaron Schmidt 
Target/No.#: Ta#50 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 41790-5 
Heat Shield W.O#: 41751-1 
Status: In progress 
Subject: Conditioning Ta#50 

Tuesday, October 18, 2016, 13:22: Roughing.

Tuesday, October 18, 2016, 13:46: Turbo pumps started.

Tuesday, October 18, 2016, 13:52: Ion gauge on.

Tuesday, October 18, 2016, 13:54: Both turbo pumps at speed.

Tuesday, October 18, 2016, 15:05: RGA on.


Wednesday, October 19, 2016, 08:46: Power/Sources on

Wednesday, October 19, 2016, 08:49: Waterline opened. No response on RGA. Vacuum stable @4.40E-7T

Wednesday, October 19, 2016, 08:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Wednesday, October 19, 2016, 08:58 : IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.9 3.90
 TBHT 27.7 3.06
 COIL + EE 27.6 5.08
 TGHT  27.7 5.70

Wednesday, October 19, 2016, 09:01: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Wednesday, October 19, 2016, 11:50: TMS:FC0 moved out & TMS:RPM0B began scanning continuously on their own. Monitor.

Wednesday, October 19, 2016, 14:45: RGA Restarted.

Wednesday, October 19, 2016, 15:25: RGA Restarted (Unable to save 14:45 Startup)


Friday, October 21, 2016, 13:27: Auto Cooling @ 2A per min

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 37.3 3.92
 TBHT 28.2 3.07
 COIL + EE 27.9 5.07
 TGHT  29.8 5.62

Friday, October 21, 2016, 15:39: IV4 Closed


Monday, October 24, 2016, 09:10:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.1 3.95
 TBHT 28.2 3.10
 COIL + EE 27.7 5.04
 TGHT  27.7 5.70

Monday, October 24, 2016, 09:10: Power/Sources off.

Monday, October 24, 2016, 09:20: Water lines purged.

Monday, October 24, 2016, 09:21: RGA off.

Monday, October 24, 2016, 09:23: Ion gauge & Turbo pumps off

Monday, October 24, 2016, 12:54: Venting.

Attachment 1: ER-580-200-30kV-m27.txt  3 kB  Uploaded Monday, October 24, 2016, 12:07  | Show | Hide all
Attachment 2: ER-580-200-30kV-m27(2).txt  3 kB  Uploaded Monday, October 24, 2016, 12:07  | Show | Hide all
Attachment 3: ER-580-200-30kV-m27(3).txt  3 kB  Uploaded Monday, October 24, 2016, 12:07  | Show | Hide all
Attachment 4: ER-580-200-30kV-m39.txt  3 kB  Uploaded Monday, October 24, 2016, 12:07  | Show | Hide all
Attachment 5: ITE-TM4-Ta#50-LP-SIS_Test_Stand.docx  724 kB  Uploaded Monday, October 24, 2016, 12:07
Attachment 6: Ta#50.docx  2.445 MB  Uploaded Monday, October 24, 2016, 12:08
Attachment 7: TS-2016-10-18-15-05.rga  655 kB  Uploaded Monday, October 24, 2016, 12:08
Attachment 8: TS-2016-10-19-14-42.rga  3.461 MB  Uploaded Monday, October 24, 2016, 12:08
Attachment 9: OMEGA_OM-DAQPRO-5300_24-Oct-16_11.03.10.dlp  1.211 MB  Uploaded Monday, October 24, 2016, 12:08
ELOG V2.9.2-2455