Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 586     Entry time: Monday, May 22, 2017, 09:43
Author: Aaron Schmidt 
Target/No.#:  
Source: HP-FEBIAD-CTL 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Tri-Coil CTL-FEBIAD test IV 

Monday, May 22, 2017, 09:41: Roughing.

Monday, May 22, 2017, 10:00: Turbo pumps started.


Tuesday, May 23, 2017, 07:45: Power/sources on.

Tuesday, May 23, 2017, 07:58: BIAS / EZL / EE @ 35 / 13 / 1.5 kV .

Tuesday, May 23, 2017, 08:19: Coil @ 50 A . Anode @ 200 V

Tuesday, May 23, 2017, 08:20: Auto ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Tuesday, May 23, 2017, 10:22: IV4 opened.

Tuesday, May 23, 2017, 10:57: Increased ramping rate for TGHT to 4 A/min - AM

Tuesday, May 23, 2017, 19:05: Cooling down target for change to Anode bias tomorrow. - AM

Tuesday, May 23, 2017, 21:04: BIAS/EZL/EE off


Wednesday, May 24, 2017, 07:16: IV4 Closed.

Wednesday, May 24, 2017, 07:18: Power/Sources off.

Changed to Anode Bias.

Wednesday, May 24, 2017, 11:00: Coil @ 50 A . Anode @ 200 V

Wednesday, May 24, 2017, 11:02: Auto ramping TGHT / TBHT to 580 / 270 A @ 4 / 2 A per min.

Wednesday, May 24, 2017, 11:09: BIAS / EZL / EE @ 35 / 13 / 1.5 kV .


Tuesday, May 30, 2017, 07:02: Auto Cooling @ 2A/min


Thursday, June 01, 2017, 14:08: IV4 Closed. RGA off.

Thursday, June 01, 2017, 14:10: Ion gauge off. Turbos off.

Thursday, June 01, 2017, 16:51: Venting

Thursday, June 01, 2017, 21:16: Roughing.

Attachment 1: CTL_FEBIAD_Test_IV.docx  1.490 MB  Uploaded Friday, June 02, 2017, 17:00
Attachment 2: TS-2017-05-22-10-07.rga  2.230 MB  Uploaded Friday, June 02, 2017, 17:00
Attachment 3: TS-2017-05-25-15-42.rga  5.047 MB  Uploaded Friday, June 02, 2017, 17:00
ELOG V2.9.2-2455