Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo pumps started.
Thursday, June 16, 2016, 15:22: Ion gauge on.
Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.
Saturday, June 18, 2016, 09:31: Cool down started.
Monday, June 20, 2016, 09:48: Sources/power/voltages off.
Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.
Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.
Monday, June 20, 2016, 11:50: Venting |