Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 983     Entry time: Wednesday, October 18, 2023, 15:43
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 45447-12 
Heat Shield W.O#: 45235-17 
Status: In progress 
Subject: Conditioning UC#43 (empty) w/ gas line 

Thermocouples attached on end plate

Indium salt @ 10 µl

3 wraps of Ta HS on oven. Gas line on center block. Empty oven.

Wednesday, October 18, 2023, 15:13: Roughing

Wednesday, October 18, 2023, 15:35: Waterline FS#5 on.

Wednesday, October 18, 2023, 15:42: TP1B on.

Wednesday, October 18, 2023, 15:52: TP1A on.

Wednesday, October 18, 2023, 16:00: IG1 on.


Thursday, October 19, 2023, 07:34: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Thursday, October 19, 2023, 09:15: IV4 opened.

Thursday, October 19, 2023, 09:42: HV sources on.

Thursday, October 19, 2023, 09:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.

Thursday, October 19, 2023, 09:45: Optics are set. Standard tune.

Thursday, October 19, 2023, 10:40: HV to 0 kV. Cage open.

Thursday, October 19, 2023, 12:16: Cage closed. HV sources on. Optics set.

Thursday, October 19, 2023, 13:41: 1st set of mass scans complete. Optics set to 'Fernando's Tune',


Friday, October 20, 2023, 06:29: Mass & wire scans continue. 

Friday, October 20, 2023, 10:33: BIAS / EE / EZL @ 43 / -2.2 / 18.5 kV.

Friday, October 20, 2023, 11:00: Spark* Optics needed full reset. 

Friday, October 20, 2023, 12:48: HV to 0 kV. HV test done 


Tuesday, October 24, 2023, 09:39: PS / sources off. IV4 closed - Tripped - Reset.

Tuesday, October 24, 2023, 09:41: IG1 off. TP off.

Attachment 1: UC#43_Conditioning_empty_with_Gas_mod.docx  1.040 MB  Uploaded Thursday, October 19, 2023, 15:45
Attachment 2: UC#43_HS_with_gas_line_mod_-_Test_2.docx  279 kB  Uploaded Friday, October 20, 2023, 11:39
Attachment 3: UC#43_HS_with_gas_line_mod_-_HV_Test.docx  107 kB  Uploaded Friday, October 20, 2023, 13:49
ELOG V2.9.2-2455