Message ID: 912     Entry time: Monday, February 28, 2022, 08:08
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Mass marker / Coil-Tube target Test #2 

Installed & roughing Friday. 

Monday, February 28, 2022, 08:07: Turbopump TP1B on.

Monday, February 28, 2022, 09:21: TP1A on.

New thermocouple setup:

  Rack position Multipin position Target position
TC1

5,9

 -  -
TC2 1,2  4,5  Right side of Ta oven
TC3 6,7  8,9  Left side of Ta oven

Monday, February 28, 2022, 18:57 : Data logging started. Forgot to set interval, not sure what it is at....

 

PLAN:

Ramp up coil to 50A, record temperatures

Ramp coil down then ramp target and tube to same values as before, record temperatures.

Ramp coil as before.


Tuesday, March 01, 2022, 14:52: Vacuum @ 1.60e-06T. Waterlines opened - AS

Tuesday, March 01, 2022, 14:54: Vacuum ok.


Turbos stopped Wednesday night. Ready to be uninstalled after venting and water purging.