Message ID: 900     Entry time: Thursday, September 23, 2021, 07:16
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Pump down empty chamber & reboot 

Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.


Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.

TS shutdown for planned power outage.


Friday, October 01, 2021, 06:03: Roughing pumps on.

Friday, October 01, 2021, 06:04: Roughing TS beam line side.

Friday, October 01, 2021, 06:52: TMS:TP6 & TMS:TP2 on. Venting Chamber side.

Friday, October 01, 2021, 06:57: IG6 on - Filament 2 manually set. Beam line side vacuum @ 1.5e-05T

Friday, October 01, 2021, 07:01: Vacuum @ 9.04e-06T & dropping steady (Beam line side) OK.

Friday, October 01, 2021, 07:05: Reboot ISAC TS PLC/IOC. Reset controls whiteout.

Friday, October 01, 2021, 07:10: MB1 restart ok.