Message ID: 231     Entry time: Monday, November 05, 2012, 14:41
Author: Anders Mjos 
Target/No.#: TiC#3 
Source: LP-SIS 
Station: ITW 
Module: TM1 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Done 
Subject: Target Removed 

Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.

The torque required to loosen the bolts were measured (from left to right):

Target legs: 48 and 30 in lbs

Tube htr: 25, 30 and 25 in lbs