Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.
Thursday, May 20, 2021, 08:44: FS#5 open. Vacuum ok.
Thursday, May 20, 2021, 08:45: Power / sources on.
Thursday, May 20, 2021, 09:34: Turbos OFF
Thursday, May 20, 2021, 10:37: Venting.
Thursday, May 20, 2021, 11:28: P2N legs no longer touching. Roughing.
Thursday, May 20, 2021, 12:05: Turbo pump TP1B on.
Thursday, May 20, 2021, 12:10: Turbo pump TP1A on.
LE:
Thursday, May 20, 2021, 15:00: Ramping stared at high warming rate. 10 or 5 A every 15 seconds
Friday, May 21, 2021, 01:31: Around midnight, the P2NHT current was very noisy for few hours, and then it dropped to zero. Turbos are now stopped to open up and investigate.
Friday, May 21, 2021, 05:45 P2N assembly removed, water lines closed and purged - one leg is fully broken
FBP:
HV tests Monday 24/05/2021 and Tuesday 25/05/2021
HS was ramped up to 30KV on monday, only 1 spark seen over night. BIAS/EZL/EE : 30KV/14KV/-1.5
Ramping to max HV on Tuesday.
40KV
AS:
Tuesday, May 25, 2021, 11:5: HV tapped down to 0 kV on BIAS / EE / EZL.
Wednesday, May 26, 2021, 07:23: Power / sources off. IG1 off. Turbo pumps off.
Wednesday, May 26, 2021, 09:04: Venting. Waterlines purged.
LE:
Wednesday, May 26, 2021, 10:37 Target removed from test stand and brought to cold lab
|