Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 685     Entry time: Monday, September 17, 2018, 11:52
Author: Aaron Schmidt 
Target/No.#: UC#25 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#: 42752-9 
Status: In progress 
Subject: Conditioning Heat Shield for UC#25 

Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 

Monday, September 17, 2018, 11:51: Roughing. Doors sealed

Monday, September 17, 2018, 12:30: Turbo pumps started.

Monday, September 17, 2018, 14:09: RGA on.


Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.

Tuesday, September 18, 2018, 09:02: Power on

Tuesday, September 18, 2018, 09:05: Sources on.

Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.8 4.02
 TBHT 24.4 3.11
 COIL + EE 24.6 5.15
 TGHT  24.6 5.79

 


Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.8 4.02
 TBHT 24.7 3.10
 COIL + EE 24.9 5.13
 TGHT  26.8 5.77

 Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.


Friday, September 21, 2018, 07:52: Power / Sources off.

Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.

Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.

 

 

Attachment 1: OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlp  1.185 MB  Uploaded Tuesday, October 02, 2018, 11:06
Attachment 2: TS-2018-09-17-14-10.rga  2.729 MB  Uploaded Tuesday, October 02, 2018, 11:06
Attachment 3: UC#25.docx  756 kB  Uploaded Tuesday, October 02, 2018, 11:06
ELOG V2.9.2-2455