Message ID: 1008     Entry time: Thursday, May 02, 2024, 13:45
Author: Dave Neilson 
Target/No.#:
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 44691-8 
Heat Shield W.O#: 45235-26 
Status: In progress 
Subject: Mass marker testing 

 Wednesday, May 01, 2024, 12:44:  pumped down to rough vacuum, TP1B now on.

Wednesday, May 01, 2024, 12:49:  TP1A on.

Thursday, May 02, 2024, 9:10:  water cooling on. no effect on vacuum

 

Thursday, May 02, 2024, 10:02:  TGHT and TBHT heating to 100A/100A at 1A/30s

Thursday, May 02, 2024, 11:02:  TGHT and TBHT heating to 230A/230A at 1.4A/10s

 Thursday, May 02, 2024, 13:53:  increasing BIAS to 30kV, EE to 2500V, EZL to 13kV

 Thursday, May 02, 2024, 14:11:  increasing  TGHT  to 280A.

 Thursday, May 02, 2024, 14:18  seeing a few sparks decreasing BIAS temporarily

Thursday, May 02, 2024, 14:25 sparks continued. decreased TGHT to 260A and saw them subside. increasing bias again.

 Thursday, May 02, 2024, 14:42 conducting mass scan - 2024-05-02-15-05 mm LPSIS a.txt

 Thursday, May 02, 2024, 15:09   increased COIL to 20A. mass scan repeated.  2024-05-02-15-37 mm LPSIS b.txt

Thursday, May 02, 2024, 15:38 decreasing TGHT to 230A, COIL at 0A

Thursday, May 02, 2024, 15:43:   repeating mass scan. 2024-05-02-16-09 mm LPSIS c.txt   * no signal. very unexpected.

Thursday, May 02, 2024, 16:10:  increased COIL to 20A, repeating mass scan.  2024-05-02-16-35 mm LPSIS d.txt

Thursday, May 02, 2024, 16:35   decreasing BIAS, EE, EZL to 0V

Thursday, May 02, 2024, 16:50 increasing TGHT to 290A at 1A/30s, to be left hot overnight.

 Friday, May 03, 2024, 10:26 increasing BIAS to 30kV, EE to 2500V, EZL to 13kV

Friday, May 03, 2024, 10:50  conducting mass scan, COIL at 0A  - 2024-05-03-11-19 mm LPSIS e.txt
 
Friday, May 03, 2024, 11:19  increasing COIL to  20A. repeating mass scan   - 2024-05-03-11-47 mm LPSIS f.txt

 Friday, May 03, 2024, 11:47 increasing COIL to  40A. repeating mass scan     -   2024-05-03-12-21 mm LPSIS g.txt

 Friday, May 03, 2024, 12:22  decreasing TGHT to 260A.    

 Friday, May 03, 2024, 12:32 mass scan:   - 2024-05-03-12-59 mm LPSIS g.txt     <- accidentally labeled g. cannot change

Friday, May 03, 2024, 13:01   decreased COIL to 20A.   mass scan:  2024-05-03-13-30 mm LPSIS i.txt

Friday, May 03, 2024, 13:31  decreased COIL to 0A. mass scan:   2024-05-03-13-59 mm LPSIS j.txt

 Friday, May 03, 2024, 14:01  reducing TGHT to 230A.  mass scan:  2024-05-03-14-37 mm LPSIS k.txt

Friday, May 03, 2024, 14:38   increasing coil to 20A.    mass scan:   2024-05-03-15-14 mm LPSIS l.txt

Friday, May 03, 2024, 15:15   increasing coil to 40A. mass scan:     2024-05-03-15-42 mm LPSIS m.txt

Friday, May 03, 2024, 15:43  COIL -> 0A. decreasing EE EZL BIAS to 0V.

Friday, May 03, 2024, 15:59   decreasing TGHT and TBHT to 0A at 1A/30s

 

 

 

 

 