Friday, November 01, 2019, 15:47: A symbiotic peek seal assembly was installed on the manipulator grip to verify the temperature at high voltage and high current.
Friday, November 01, 2019, 15:48: Three thermocouples added for temperature readings.
Friday, November 01, 2019, 15:47: Roughing
Friday, November 01, 2019, 16:19: Turbos on.
Friday, November 01, 2019, 16:27: IG1 on.
Friday, November 01, 2019, 16:29: RGA on.
AS
Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.
Monday, November 04, 2019, 07:44: Power / sources on.
Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.
Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.
FM
Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.
Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.
Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.
Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.
Monday, November 04, 2019, 15:04: Bias to 40 kV. One spark only. Seems stable now.
Sparks occurred sparsely. Max time without a spark was 26 minutes.
Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 16:16: RGA restart.
AS
Tuesday, November 05, 2019, 08:30: RGA Restarted.
Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.
Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.
Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.
Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.
Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.
Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.
Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.
Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.
Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.
Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.
Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.
Friday, November 15, 2019, 08:43: Venting.
|