Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 518     Entry time: Monday, June 27, 2016, 13:11
Author: Aaron Schmidt 
Target/No.#: SiC#33 
Source: HP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#: 41120-7 
Status:  
Subject: Conditioning SiC#33 

Monday, June 27, 2016, 12:05: Roughing.

Monday, June 27, 2016, 13:08: Turbo pumps on.

Monday, June 27, 2016, 13:15: Ion Gauge on.

Monday, June 27, 2016, 13:27: RGA on.


Tuesday, June 28, 2016, 08:20: Water, power/sources on. Vacuum stable at 2.2E-7 T. No response on RGA.

Tuesday, June 28, 2016, 08:33: Auto ramping TGHT/TBHT @ 2A/1A min to 580A/200A.

Tuesday, June 28, 2016, 08:35: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV

Tuesday, June 28, 2016, 08:47:

Device Temp
[C]
 Flow
[lpm]
 HS + MSP  27.8 3.82
 TBHT  28.8 3.06
 COIL + EE  27.1 4.90
 TGHT  27.3 5.50

Tuesday, June 28, 2016, 11:17: Restarted RGA program (after crash) -AM

Tuesday, June 28, 2016, 15:46:

Device Temp
[C]
 Flow
[lpm]
 HS + MSP  34.8 3.82
 TBHT  29.1 2.98
 COIL + EE  28.8 4.84
 TGHT  30.8 5.48

 


Wednesday, June 29, 2016, 08:21: Restarted RGA (crashed).

Wednesday, June 29, 2016, 08:22:

Device Temp
[C]
 Flow
[lpm]
 HS + MSP  34.8 3.82
 TBHT  29.9 3.05
 COIL + EE  28.7 4.84
 TGHT  30.6 5.48

Wednesday, June 29, 2016, 09:5: Ramping TBHT to 220 A

Wednesday, June 29, 2016, 11:06: EE to 2.0kV

Wednesday, June 29, 2016, 11:16: Auto cooling TGHT/TBHT @ 3A/1.5A min.

Wednesday, June 29, 2016, 13:45: Sources BIAS/EZL/EE off. TBHT @ 0A & TGHT @ 134.5A

Wednesday, June 29, 2016, 15:31:

Device Temp
[C]
 Flow
[lpm]
 HS + MSP  29.0 3.85
 TBHT 29.7 3.04
 COIL + EE  28.8 4.86
 TGHT 28.9 5.42

 Wednesday, June 29, 2016, 15:39: Water lines purged.

Attachment 1: vlcsnap-2016-06-29-14h49m07s9.png  61 kB  Uploaded Wednesday, June 29, 2016, 15:51  | Show | Hide all
Attachment 2: vlcsnap-2016-06-29-14h49m47s190.png  31 kB  Uploaded Wednesday, June 29, 2016, 15:51  | Show | Hide all
Attachment 3: ITW-TM2-SiC#33-HP-SIS_Test_Stand.docx  605 kB  Uploaded Wednesday, July 20, 2016, 09:42
Attachment 4: SiC#_33.docx  1.948 MB  Uploaded Wednesday, July 20, 2016, 09:42
Attachment 5: OMEGA_OM-DAQPRO-5300_29-Jun-16_16.21.32.dlp  4.628 MB  Uploaded Wednesday, July 20, 2016, 09:42
Attachment 6: TS-2016-06-27-13-18.rga  626 kB  Uploaded Wednesday, July 20, 2016, 09:43
Attachment 7: TS-2016-06-28-11-16.rga  19 kB  Uploaded Wednesday, July 20, 2016, 09:43
Attachment 8: TS-2016-06-29-08-19.rga  216 kB  Uploaded Wednesday, July 20, 2016, 09:43
ELOG V2.9.2-2455