TSG:RP1 Replacement
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2. Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested.