Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 629     Entry time: Wednesday, February 07, 2018, 08:46
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: BIAS Power supply installation 

Wednesday, February 07, 2018, 08:40: A 75 kV Glassman power supply was installed in the rack for use in further HV testing.

-The 75kV power supply is linked into the keyed interlock system. The key & switch labelled BIAS/EZL will unlock it.

-The PS is currently not connected to the epics controls and can only be adjusted manually.

-The old Glassman supply is disconnected and removed from the cage.

Attachment 1: BIAS_PS_off_top_switch.jpg  1.207 MB  Uploaded Thursday, February 08, 2018, 10:52  | Show | Hide all
Attachment 2: BIAS_PS_70kV_rear_bottom.jpg  1.190 MB  Uploaded Thursday, February 08, 2018, 10:52  | Show | Hide all
Attachment 3: BIAS_PS_70kV_Front_bottom.jpg  953 kB  Uploaded Thursday, February 08, 2018, 10:53  | Show | Hide all
ELOG V2.9.2-2455