679
|
Saturday, November 23, 2024, 11:11 |
Darwin Ortiz Rosales | ZrC | | LP TUBE | Done | ZrC 24E9T1 + std conditioning and sintering | Saturday, November 23, 2024, 11:08
No milling ZrC material sintering
inside graphite cartridge |
|
678
|
Wednesday, October 02, 2024, 19:24 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | sintering TiC Experiment | Wednesday, October 02, 2024, 19:21
Ta endcup at front end of container
End-caps on the graphite cartridge |
|
677
|
Tuesday, September 10, 2024, 13:16 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | A boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr |
|
676
|
Monday, September 09, 2024, 19:08 |
Darwin Ortiz Rosales | TaC | | LP-SIS | Done | TaC coating sintering LP-SIS with gas line | Monday, September 09, 2024, 19:06
The coated container was wrapped
in 4 Ta foil heatshields. |
|
675
|
Saturday, September 07, 2024, 09:55 |
Darwin Ortiz Rosales | TaC | 45447-13 | LP-SIS | Done | TaC coating sintering | Saturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields. |
|
674
|
Friday, August 30, 2024, 11:33 |
Darwin Ortiz Rosales | Ta | 45447-8 | LP-IG-LIS | Done | TaC coating sintering | Friday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields. |
|
673
|
Monday, August 19, 2024, 13:17 |
John Wong | np-Ta | | TARGET BOAT | In progress | Carbonization of heat stabilized np-Ta fibres - 2nd Attempt | Monday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at |
|
672
|
Wednesday, August 14, 2024, 16:24 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | In progress | EVAP2 Calibration - Vanadium |
|
|
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
|
|
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on |
|
669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
|
|
668
|
Wednesday, August 07, 2024, 15:37 |
Aaron Schmidt | | | | | Turning on EVAP2's turbo pump | Wednesday, August 07, 2024, 15:36: Roughing.
Had initially been roughed & TP started
w/ Marla CS, however it timed out. Restarting. |
|
667
|
Friday, July 26, 2024, 10:05 |
John Wong | np-Ta | | TARGET BOAT | Done | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) |
|
|
666
|
Thursday, July 25, 2024, 15:46 |
Angelina Chen | np-Ta | | TARGET BOAT | In progress | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) | Thursday, July 25, 2024, 15:18
Target container consists of two
np-Ta fibres disk samples. Both disks are |
|
665
|
Monday, July 22, 2024, 14:59 |
Aaron Schmidt | Ta | 45447-14 | LP-SIS | In progress | Conditioning Ta#67 Thin foil | Ta#67 Thin foil |
|
664
|
Wednesday, June 05, 2024, 07:18 |
Darwin Ortiz Rosales | SiC | | LP TUBE | Done | sinterin experiment 240604 | Wednesday, June 05, 2024, 07:14
SiC discs loaded into tantalum tube.
New mixing (two types) and old mixing. |
|
663
|
Wednesday, May 29, 2024, 22:55 |
Darwin Ortiz Rosales | SiC | | LP TUBE | Done | Repeat of SiC experiment with mixed only casts | Wednesday, May 29, 2024, 22:52
Small graphite cartridge was loaded
with SiC discs 240523-1 and 240523-2 and |
|
662
|
Monday, May 27, 2024, 07:12 |
Darwin Ortiz Rosales | SiC | | LP TUBE | Done | SiC (PAA dispersant experiment) | Monday, May 27, 2024, 07:09
Small graphite cartridge was loaded
with SiC discs 240523-1 and 240523-2. |
|
661
|
Tuesday, May 07, 2024, 06:20 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Sintering TaC coating on endcaps | Tuesday, May 07, 2024, 06:16
TP was swapped on previous day (May
6th) |
|
660
|
Wednesday, May 01, 2024, 11:54 |
Darwin Ortiz Rosales | TaC | 25447-27 | HP-SIS | Done | TaC coating sintering | Wednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields. |
|
659
|
Friday, April 26, 2024, 06:19 |
Darwin Ortiz Rosales | TaC | 45447-29 | HP-SIS | Done | TaC coating sintering |
Monday, April 29, 2024, 19:50
Started coating with coating stand. |
|
658
|
Thursday, April 04, 2024, 12:07 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240404TiC sintering/conditioning | Thursday, April 04, 2024, 12:06
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with _________ |
|
657
|
Wednesday, April 03, 2024, 06:46 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240402TiC | Wednesday, April 03, 2024, 06:46
Ta container tube, wrapped in 4 Ta |
|
656
|
Thursday, February 29, 2024, 07:40 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240228TiC conditioning | Thursday, February 29, 2024, 07:40
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with _________ |
|
655
|
Wednesday, February 21, 2024, 06:23 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240220TiC conditioning | Wednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with 201 D |
|
654
|
Wednesday, February 07, 2024, 22:49 |
Darwin Ortiz Rosales | TiC | 44692-11 | LP TUBE | Done | 240206TiC conditioning |
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped
in 4 Ta foil heat-shields, and loaded with |
|
653
|
Monday, January 29, 2024, 16:45 |
Darwin Ortiz Rosales | TaC | | LP-FEBIAD | Done | TaC coating sintering | Monday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields. |
|
652
|
Friday, January 26, 2024, 07:06 |
Darwin Ortiz Rosales | TaC | 45447-1 | HP-FEBIAD | Done | TaC coating sintering | Friday, January 26, 2024, 07:05
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2 |
|
651
|
Thursday, December 14, 2023, 09:58 |
Darwin Ortiz Rosales | SiC | 41369-2 | HP-SIS | Done | 231208SiC conditioning | Thursday, December 14, 2023, 09:53
Target left pumping down in Evap2
overnight. |
|
650
|
Wednesday, December 06, 2023, 09:57 |
Darwin Ortiz Rosales | SiC | 45447-4 | HP-FEBIAD | Done | 231204SiC conditioning | Wednesday, December 06, 2023, 09:47
Target number of foils:370 |
|
649
|
Monday, November 06, 2023, 14:07 |
Darwin Ortiz Rosales | Empty | 45220-4 | LP-SIS | Done | TaC coating sintering | Monday, November 06, 2023, 09:59
The coated container was wrapped
in 4 Ta foil heatshields. |
|
648
|
Friday, October 20, 2023, 07:24 |
Darwin Ortiz Rosales | TaC | 45447-11 | LP-SIS | Done | TaC coating sintering | Friday, October 20, 2023, 07:20
The coated container was wrapped
in 4 Ta foil heatshields. |
|
647
|
Thursday, October 05, 2023, 12:47 |
Aaron Schmidt | Ta | 45220-3 | LP-SIS | In progress | Conditioning Ta#68 (Spare) | Ta#(Spare) LP-SIS |
|
646
|
Wednesday, September 20, 2023, 14:26 |
Aaron Schmidt | Ta | 45220-5 | LP-SIS | In progress | Conditioning Ta#66 | Ta#66 LP-SIS |
|
645
|
Tuesday, September 12, 2023, 09:54 |
Darwin Ortiz Rosales | TaC | 41369-2 | HP-SIS | Done | TaC coating sintering | Tuesday, September 12, 2023, 09:51
The coated container was wrapped
in 3 Ta foil heatshield and left in evap2 |
|
644
|
Thursday, August 31, 2023, 07:09 |
Darwin Ortiz Rosales | TaC | 45447-4 | HP-FEBIAD | Done | TaC coating sintering | Thursday, August 31, 2023, 07:07
The coated container was wrapped
in 3 Ta foil heatshields. |
|
643
|
Tuesday, August 29, 2023, 12:47 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering | Tuesday, August 29, 2023, 12:46
The coated container was wrapped
in 4 Ta foil heatshields. |
|
642
|
Saturday, August 26, 2023, 09:41 |
Darwin Ortiz Rosales | TaC | 45220-10 | LP-SIS | Done | TaC coating sintering |
Saturday, August 26, 2023, 09:39
The coated container was wrapped
in 4 Ta foil heatshields. |
|
641
|
Thursday, August 24, 2023, 14:18 |
Aaron Schmidt | Nb | 45447-9 | LP-IG-LIS | In progress | Conditioning Nb#11 | Nb#11 LP-IG-LIS target
description: |
|
640
|
Tuesday, August 22, 2023, 09:35 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering (second coating on same tube) | Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields. |
|
639
|
Tuesday, August 15, 2023, 12:03 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering | Tuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields. |
|
638
|
Wednesday, June 21, 2023, 10:37 |
Aaron Schmidt | Nb | 45447-7 | LP-IG-LIS | In progress | Conditioning Nb#10 | Nb#10 LP-IG-LIS target description:
|
|
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure. |
|
636
|
Tuesday, June 06, 2023, 09:14 |
Darwin Ortiz Rosales | C | 44139-4 | TARGET BOAT | Done | Graphite inside insert Experiment 2 (regular formulation discs) | Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields. Note final |
|
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. |
|
634
|
Wednesday, May 24, 2023, 15:23 |
Darwin Ortiz Rosales | | 44139-4 | LP TUBE | Done | Graphite inside insert Experiment 1 |
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with |
|
633
|
Tuesday, May 02, 2023, 14:20 |
John Wong | np-TiO2 | | TARGET BOAT | In progress | Carbonization of np-TiO2 spun fibrous pellets/fibre mats | Tuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with |
7x |
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs. |
|
631
|
Friday, April 28, 2023, 09:39 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 |
|
|
630
|
Thursday, April 27, 2023, 22:18 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
629
|
Thursday, April 27, 2023, 21:48 |
Carla Babcock | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
628
|
Thursday, April 27, 2023, 06:30 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 |
|
|
627
|
Wednesday, April 26, 2023, 22:26 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
626
|
Wednesday, April 26, 2023, 18:20 |
Carla Babcock | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
625
|
Wednesday, April 26, 2023, 09:48 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 | Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs
and 4 TiC removable discs for analyses |
|
624
|
Monday, April 24, 2023, 09:12 |
Darwin Ortiz Rosales | TaC | 44692-5 | LP-FEBIAD | Done | TaC coating sintering | Sunday, April 23, 2023, 07:23
The coated container was wrapped
in 3 Ta foil heatshields. |
|
623
|
Thursday, April 20, 2023, 07:00 |
Darwin Ortiz Rosales | TaC | 41790-7 | LP-FEBIAD | Done | TaC coating sintering | Thursday, April 20, 2023, 06:59
The coated container was wrapped
in 3 Ta foil heatshields. |
|
622
|
Tuesday, April 18, 2023, 06:48 |
Darwin Ortiz Rosales | TaC | 45220-11 | LP-SIS | Done | TaC coating sintering | Tuesday, April 18, 2023, 06:46
The coated container was wrapped
in four Ta foil heatshields. |
|
621
|
Sunday, April 16, 2023, 14:08 |
Darwin Ortiz Rosales | TaC | 45220-14 | LP-SIS | Done | TaC coating sintering | Sunday, April 16, 2023, 14:08
The coated container was wrapped
in four Ta foil heatshields. |
|
620
|
Wednesday, April 12, 2023, 09:53 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coating sintering |
Wednesday, April 12, 2023, 09:53
The coated container was wrapped
in 3 Ta foil heatshields. |
|
619
|
Tuesday, April 04, 2023, 12:50 |
Darwin Ortiz Rosales | TaC | 45447-1 | HP-FEBIAD | Done | TaC coating sintering | Tuesday, April 04, 2023, 12:48
Ta HP-FEBIAD was coated |
|
618
|
Thursday, March 30, 2023, 12:45 |
Aaron Schmidt | Ta | 45220-7 | LP-SIS | In progress | Conditioning Ta#65 | Thursday, March 30, 2023, 12:27:
Ta#65 LP-SIS target description: |
|
617
|
Thursday, March 16, 2023, 14:47 |
Darwin Ortiz Rosales | TaC | 45220-9 | LP-SIS | Done | TaC coating sintering | Thursday, March 16, 2023, 13:38
The coated container was wrapped
in four Ta foil heatshields. |
|
616
|
Monday, March 13, 2023, 22:31 |
Darwin Ortiz Rosales | SiC | 44692-2 | HP-SIS | Done | SiC-230313 | Monday, March 13, 2023, 22:28
Total number of foils:380 |
|
615
|
Sunday, March 12, 2023, 08:06 |
Darwin Ortiz Rosales | Ta | 44692-2 | HP-SIS | Done | TaC coating sintering | Sunday, March 12, 2023, 08:04
Ta HP-SIS was coated |
|
614
|
Thursday, March 09, 2023, 06:58 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday,
March 09, 2023, 06:53
2 TaC coated springs and 12 |
|
613
|
Monday, March 06, 2023, 21:34 |
Darwin Ortiz Rosales | SiC | 44692-3 | HP-SIS | Done | 230306SiC conditioning | Monday, March 06, 2023, 21:29
Total number of foils:382 |
|
612
|
Saturday, March 04, 2023, 08:34 |
Darwin Ortiz Rosales | TiC | 44692-7 | LP-FEBIAD | Done | TiC230301 conditioning | Saturday, March 04, 2023, 08:29
|
|
611
|
Wednesday, March 01, 2023, 21:49 |
Darwin Ortiz Rosales | Ta | 44692-3 | HP-SIS | Done | TaC coating sintering | Wednesday, March 01, 2023, 21:46
Ta HP-SIS was coated |
|
610
|
Tuesday, February 28, 2023, 07:21 |
Darwin Ortiz Rosales | Ta | 44692-7 | LP-FEBIAD | Done | TaC coating sintering | Tuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated |
|
609
|
Thursday, February 23, 2023, 18:24 |
Darwin Ortiz Rosales | TaC | 45441-2 | HP-FEBIAD | Done | TaC coating sintering | Thursday, February 23, 2023, 18:20
Ta HP-FEBIAD was coated |
|
608
|
Thursday, February 09, 2023, 09:49 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | condition Nb samples (Phillip) | Thursday, February 09, 2023, 09:47
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb |
|
607
|
Friday, December 16, 2022, 10:03 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | 4 TaC coated springs and 4 Tac coated caps
loaded into a target boat.
Target boat wrapped in 4 Ta heatshields |
|
606
|
Friday, December 02, 2022, 09:50 |
Darwin Ortiz Rosales | | 45220-12 | TARGET BOAT | Done | Grahite disc conditioning 221130-Graphite | Friday, December 02, 2022, 09:46
297 graphite discs packed into a
Ta tube wrapped in four heatshields. |
|
605
|
Thursday, November 24, 2022, 11:08 |
John Wong | TiC | | TARGET BOAT | Done | Synthesis of TiC fibrous disc (TiO2/PAN only) | Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample |
|
604
|
Tuesday, November 22, 2022, 14:59 |
Darwin Ortiz Rosales | TaC | 45220-12 | LP-SIS | Done | TaC coating sintering | Tuesday, November 22, 2022, 14:58
The coated container was wrapped
in four Ta foil heatshields. |
|
603
|
Friday, November 18, 2022, 15:13 |
Darwin Ortiz Rosales | TaC | 45220-1 | LP-SIS | Done | TaC coating sintering | Friday, November 18, 2022, 15:08
The coated container was wrapped
in four Ta foil heatshields. |
|
602
|
Thursday, November 17, 2022, 08:14 |
Darwin Ortiz Rosales | TaC | 44692-12 | TARGET BOAT | Done | TaC coating sintering | Thursday, November 17, 2022, 08:11
The coated container was wrapped
in four Ta foil heatshields. |
|
601
|
Thursday, November 10, 2022, 07:40 |
Darwin Ortiz Rosales | TaC | 45220-13 | LP-SIS | Done | TaC coating sintering | Thursday, November 10, 2022, 07:40
The coated container was wrapped
in four Ta foil heatshields. |
|
600
|
Monday, November 07, 2022, 14:26 |
Darwin Ortiz Rosales | TaC | 44139-4 | TARGET BOAT | Done | TaC coating sintering | Monday, November 07, 2022, 14:24
The coated container tube was wrapped
in four Ta foil heatshields. |
|
599
|
Tuesday, November 01, 2022, 17:35 |
John Wong | TiC | | TARGET BOAT | Done | Np-TiC fibres systhesis | Tuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner. Each |
|
598
|
Friday, October 28, 2022, 07:59 |
Darwin Ortiz Rosales | TaC | 45220-6 | LP-SIS | Done | TaC coating sintering | Friday, October 28, 2022, 07:58
The coated container was wrapped
in four Ta foil heatshields. |
|
597
|
Tuesday, October 25, 2022, 12:25 |
Darwin Ortiz Rosales | TaC | 44139-15-SK | LP-SIS | Done | TaC coating sintering | Tuesday, October 25, 2022, 12:18
Container wrapped in 4 Ta foil heatshields
Target temperature on OMEGA= 1850-1900 |
|
596
|
Wednesday, October 19, 2022, 09:50 |
John Wong | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC |
|
|
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2 |
|
594
|
Monday, October 17, 2022, 11:32 |
Darwin Ortiz Rosales | TaC | 45220-2 | LP-SIS | Done | TaC coating sintering | Monday, October 17, 2022, 10:03
The coated container was wrapped
in 4 Ta foil heatshields. |
|
593
|
Thursday, September 29, 2022, 10:02 |
Darwin Ortiz Rosales | | 44139-3 | TARGET BOAT | Done | 220926-Graphite conditioning in target tube | Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields. |
|
592
|
Thursday, September 22, 2022, 07:15 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday, September 22, 2022, 07:13
Each endcap is separated with |
|
591
|
Wednesday, September 14, 2022, 11:48 |
Darwin Ortiz Rosales | | | TARGET BOAT | Done | Grahite disc conditioning 220907G | Wednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields. |
|
590
|
Thursday, September 01, 2022, 12:32 |
Darwin Ortiz Rosales | TaC | 44691-13 | LP-SIS | Done | TaC coating sintering | Thursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields. |
|
589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 |
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough
vacuum |
|
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31 |
|
586
|
Wednesday, June 29, 2022, 10:12 |
Darwin Ortiz Rosales | TaC | 44692-10 | HP-FEBIAD | Done | TaC coating sintering | Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated |
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: |
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this
morning and it was soft started. It |
|
582
|
Tuesday, June 14, 2022, 09:04 |
Darwin Ortiz Rosales | Ta | 37978-1 | HP-FEBIAD | Done | TaC coating sintering | Tuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated |
|
581
|
Thursday, June 09, 2022, 19:20 |
John Wong | | boat | | Done | carbonize PAN 10% discs |
|
|
580
|
Thursday, June 09, 2022, 09:09 |
Darwin Ortiz Rosales | Ta | | HP-FEBIAD | Done | Troubleshooting | Thursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container |
|
579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun |
|
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: |
|
577
|
Thursday, June 02, 2022, 16:53 |
Aaron Schmidt | Ta | 44691-12 | LP-SIS | In progress | Conditioning Ta#64 | Ta#64 LP-SIS target
description: |
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: |
|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from |
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring |
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend. |
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. |
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated |
|
569
|
Wednesday, March 09, 2022, 06:27 |
Darwin Ortiz Rosales | TaC | 42464-2 | HP-FEBIAD | Done | TaC coating/sintering | Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated |
|
568
|
Tuesday, February 15, 2022, 12:37 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( |
|
566
|
Wednesday, February 09, 2022, 08:08 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb annealing for Phillip | Wednesday, February 09, 2022, 06:55
Target boat with a layer of |
|
565
|
Thursday, November 25, 2021, 14:00 |
Aaron Schmidt | | | | | Lower insulator replaced | The Helicoil had mostly pulled out
of the old one.
|
|
564
|
Wednesday, November 10, 2021, 18:07 |
Aaron Schmidt | Ta | 44691-11 | LP-SIS | In progress | Conditioning Ta#63 | Ta#63 LP-SIS target description:
|
|
563
|
Monday, November 08, 2021, 09:36 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (8 caps and 2 springs) | Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. |
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers) |
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC |
|
560
|
Wednesday, October 27, 2021, 11:09 |
Darwin Ortiz Rosales | Ta | 44691-3 | LP-SIS | Done | TaC coating/sintering | Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52 |
|
559
|
Monday, October 25, 2021, 11:53 |
Darwin Ortiz Rosales | TaC | 42218-4 | HP-IG-LIS | Done | TaC coating/sintering | Monday, October 25, 2021, 11:52
Ta IGLIS tube was coated with |
|
558
|
Thursday, October 21, 2021, 09:58 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Coating of Ta caps and Ta springs (10 caps and 2 springs) |
Thursday, October 21, 2021, 10:02
10 TaC coated Ta caps, wrapped in |
|
557
|
Wednesday, October 13, 2021, 08:35 |
Aaron Schmidt | | | | Problems | Troubleshoot - Pump down issues. | Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35: |
|
556
|
Tuesday, September 14, 2021, 09:33 |
Darwin Ortiz Rosales | | 42218-5 | LP-IG-LIS | Done | TaC coating/sintering | Tuesday, September 14, 2021, 09:32
Ta IGLIS tube was coated with |
|
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto |
|
554
|
Thursday, September 02, 2021, 07:14 |
Darwin Ortiz Rosales | TaC | 44691-7 | LP-SIS | Done | TaC coating/sintering | Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC |
|
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
552
|
Wednesday, July 21, 2021, 16:45 |
Ferran Boix Pamies | Empty | | TARGET BOAT | Done | parasitic target thermal tests v2, foil measurement. | 2021-07-21 4:44pm Vacumm at 1e-5Torr.
Water cooling leak check ok.
|
|
551
|
Wednesday, June 23, 2021, 17:48 |
Aaron Schmidt | Ta | 44691-4 | LP-SIS | In progress | Conditioning Ta#62 (Replacement) | Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10) |
|
550
|
Friday, June 11, 2021, 08:41 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Nb treatment for Norman | Friday, June 11, 2021, 08:05
Target boat with a layer of |
|
549
|
Wednesday, April 28, 2021, 11:57 |
Darwin Ortiz Rosales | SiC | 42218-7 | HP-SIS | Done | sintering discs for SiC#41 (or back-up for #40) | Wednesday, April 28, 2021, 11:54
Total number of foils: 449 (not including
analysis discs) |
|
548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the |
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
|
|
546
|
Thursday, April 08, 2021, 08:25 |
Aaron Schmidt | Ta | 44139-10 | LP-SIS | In progress | Conditioning Ta#62 & Flex - line HS installed | Ta#62 LP-SIS target
description: |
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
543
|
Sunday, March 28, 2021, 11:24 |
Marla Cervantes | | NA (Ta-tube) | | Done | Re-coat 3 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
542
|
Friday, March 26, 2021, 16:23 |
Marla Cervantes | Empty | 44489-7 | | Done | Re-coat 2 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
541
|
Friday, March 26, 2021, 13:58 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coat 1 | Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2. |
|
540
|
Thursday, March 25, 2021, 11:24 |
Marla Cervantes | Empty | NA (Cu-Tube | | Done | Re-coat test 4 | Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result: |
|
539
|
Thursday, March 25, 2021, 07:57 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Thursday, March 25, 2021, 07:55: Vacuum
@ 5.12e-07T. Waterlines opened. |
|
538
|
Tuesday, March 23, 2021, 11:28 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coating test 3 | Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result: |
|
537
|
Tuesday, March 23, 2021, 08:07 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Modified HS installed with new brackets
as per Marla.
Tuesday, March 23, 2021, 08:02: Vacuum |
|
536
|
Tuesday, March 16, 2021, 08:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | sintering of TaC on Caps and springs | Tuesday, March 16, 2021, 08:28
Each endcap is separated with |
|
535
|
Tuesday, March 09, 2021, 11:54 |
Darwin Ortiz Rosales | TaC | 42464-1 | HP-FEBIAD | Done | TaC coating/sintering | Tuesday, March 09, 2021, 11:54
Container coated with |
|
534
|
Friday, March 05, 2021, 10:48 |
Darwin Ortiz Rosales | TaC | 44691-1 | LP-SIS | Done | TaC coating/sintering | Friday, March 05, 2021, 10:47
Ta tube was coated with TaC |
|
533
|
Tuesday, March 02, 2021, 11:32 |
Darwin Ortiz Rosales | TaC | 44691-5 | LP-SIS | Done | TaC coating/sintering | Tuesday, March 02, 2021, 11:26
Ta tube was coated with TaC |
|
532
|
Monday, March 01, 2021, 13:58 |
Aaron Schmidt | | | | | Flex - line HS installed | Flex-Line HS had been fully scrubbed out
earlier. All gaskets replaced.
Empty. Quick check for leaks. |
|
531
|
Friday, February 26, 2021, 09:28 |
Ferran Boix Pamies | Empty | none | | Done | Parasitic target thermal tests | Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating |
|
530
|
Tuesday, February 23, 2021, 08:59 |
Marla Cervantes | | NA (Cu-tube) | | Done | Re coating Test 2 | Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed
and when dry it was installed in the EVAP2, |
|
529
|
Saturday, February 13, 2021, 08:14 |
Darwin Ortiz Rosales | SiC | 41992-1 | TARGET BOAT | Done | Sintering of SiC discs for SEM | Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs |
|
528
|
Thursday, February 11, 2021, 10:57 |
Marla Cervantes | | NA | | Done | Re coating Test 1 | Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate
it and deposit a layer of Re on the inner |
|
527
|
Tuesday, February 09, 2021, 06:48 |
Aaron Schmidt | | NA | | Done | Ta coating test | Monday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop. |
|
526
|
Monday, February 01, 2021, 13:57 |
Darwin Ortiz Rosales | SiC | 40282-4 | TARGET BOAT | Done | Sintering of SiC discs for SEM | Monday, February 01, 2021, 13:52
|
|
525
|
Tuesday, November 24, 2020, 12:56 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Graphite casting conditioning | Tuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum |
|
524
|
Tuesday, November 24, 2020, 08:13 |
Aaron Schmidt | | | | | Flex - line HS installed | Monday, November 23, 2020, 17:01: Flex-line
HS installed.
Tuesday, November 24, 2020, |
|
523
|
Thursday, November 05, 2020, 15:13 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | cleaning treatment. | 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on. |
|
522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
|
520
|
Tuesday, October 27, 2020, 10:25 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | parasitic target commissioning | 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements |
|
519
|
Wednesday, October 21, 2020, 14:39 |
Aaron Schmidt | Nb | 44508-2 | LP-SIS | In progress | Conditioning Nb#9 | Nb#9 LP-SIS target description:
|
|
518
|
Friday, October 16, 2020, 16:31 |
Luca Egoriti | Empty | | TARGET BOAT | In progress | HPOG annealing | Friday, October 16, 2020, 11:30
Target mounted in EVAP2. Pump
down started |
|
517
|
Thursday, October 15, 2020, 18:51 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | heat gun plus parasitic target thermal comissioning. | 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. |
|
516
|
Tuesday, October 13, 2020, 11:15 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | foil heating | 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s |
|
515
|
Friday, October 09, 2020, 09:50 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | Tests, radiation gun for parasitic target | 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on, |
|
514
|
Wednesday, October 07, 2020, 12:25 |
Aaron Schmidt | | | | In progress | IEVAP2:TP1 Swap out. | Wednesday, October 07, 2020
TP1 was not spinning up past 4krpm.
Stalling & tripping out. Examined with |
|
513
|
Tuesday, October 06, 2020, 14:23 |
Aaron Schmidt | Ta | 44508-1 | LP-SIS | In progress | Conditioning Ta#61 | Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs |
|
512
|
Monday, September 28, 2020, 11:53 |
John Wong | np-SiC | | TARGET BOAT | In progress | np-SiC carbonization | Monday, September 28, 2020, 11:49
6 discs of np-SiC were loaded to
the target boat wrapped with 3 layers of |
|
511
|
Monday, September 28, 2020, 09:36 |
John Wong | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward |
|
|
510
|
Friday, September 25, 2020, 10:32 |
Darwin Ortiz Rosales | Nb | | TARGET BOAT | Done | Heat Treatment of Nb for Edward | Friday, September 25, 2020, 10:30
Target boat with a layer of |
|
509
|
Thursday, September 24, 2020, 13:37 |
Aaron Schmidt | Nb | | TARGET BOAT | | Nb Test SRF group | Sample loaded into a vertical target boat.
Flex line HS removed, SS waterline HS installed
-AS. |
|
508
|
Monday, September 21, 2020, 17:01 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Conditioning graphite target #3 | Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the |
|
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2 |
|
506
|
Thursday, September 10, 2020, 07:53 |
Aaron Schmidt | Empty | 41790-8 | LP-FEBIAD | Done | Fernando FEBIAD / Anode testing. | FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check |
|
505
|
Saturday, September 05, 2020, 21:33 |
Marla Cervantes | Empty | | | Done | Pristine Ta tube calibration | Saturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3 |
|
504
|
Monday, August 31, 2020, 12:57 |
Marla Cervantes | | 44489-15 | | Done | TaC coating heating test | Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under |
|
503
|
Sunday, August 30, 2020, 18:28 |
Marla Cervantes | Empty | 44489-13 | | Done | TaC coating/sintering | Sunday, August 30, 2020, 06:47
A short tantalum tube was coated |
|
502
|
Wednesday, August 26, 2020, 10:27 |
Marla Cervantes | | 44489-8 | | Done | C-Cartridge test #2 | Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with |
|
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge |
|
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube |
|
499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta, |
|
498
|
Wednesday, August 12, 2020, 11:57 |
Marla Cervantes | Empty | 44489-9 | TARGET BOAT | Done | Pristine Ta tube calibration | Short oven loaded with additional
hardware are spacers into the flex-line HS.
|
|
497
|
Wednesday, August 12, 2020, 08:58 |
Aaron Schmidt | | | | In progress | Install Flex line HS | Flex line HS installed. New SS gaskets.
Wednesday, August 12, 2020, 08:56:
Roughing (Check). |
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
494
|
Wednesday, August 05, 2020, 13:38 |
Aaron Schmidt | | | | | RP Swap on EVAP 2 | BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37: |
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs |
|
491
|
Monday, July 20, 2020, 19:25 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 2 of 2 | Monday, July 20, 2020, 19:27
Coated Ta tube cotaining 355 |
|
490
|
Thursday, July 16, 2020, 11:15 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 1 of 2 | Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining |
|
489
|
Monday, July 13, 2020, 11:03 |
Aaron Schmidt | | | | | Pump down / leak / vacuum check. | Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications. |
|
488
|
Monday, June 15, 2020, 14:28 |
Darwin Ortiz Rosales | Empty | 42218-7 | HP-SIS | Done | TaC coating/sintering | Monday, June 15, 2020, 13:30
Container coated with TaC and |
|
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) |
|
486
|
Monday, June 01, 2020, 12:03 |
Aaron Schmidt | Ta | 44139-13 | LP-SIS | In progress | Ta#60 Conditioning | Ta#60 LP-SIS target
description: |
|
485
|
Friday, May 29, 2020, 10:26 |
Marla Cervantes | Empty | 43044-8 | LP-SIS | Done | TaC coating/sintering | Friday, May 29, 2020, 08:52
Ta tube was coated with TaC |
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
|
483
|
Sunday, May 24, 2020, 13:39 |
Marla Cervantes | Empty | 44139-11 | LP-SIS | Done | TaC coating/sintering | Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC |
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
481
|
Wednesday, May 20, 2020, 07:18 |
Aaron Schmidt | | | | | Check Evap 2 | Gradually open waterlines under vacuum
after period of no use.
Wednesday, May 20, 2020, 07:17: Vacuum |
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|
479
|
Wednesday, March 18, 2020, 07:21 |
Marla Cervantes | TaC | 44139-11 | LP-SIS | Done | TaC coating/sintering | Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC |
|
478
|
Monday, March 16, 2020, 13:47 |
Marla Cervantes | | 40282-5 | TARGET BOAT | Done | Conditioning graphite target #1 | Monday, March 16, 2020, 13:47
Target material characteristics:
Graphite cast of 0.965g/cm3, 287 D-shaped |
|
477
|
Friday, March 13, 2020, 14:21 |
Darwin Ortiz Rosales | SiC | 42218-8 | HP-SIS | Done | Conditioning of SiC discs (sintering) (RUSH) | Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm |
|
476
|
Tuesday, March 10, 2020, 09:34 |
Darwin Ortiz Rosales | Empty | 42218-8 | HP-SIS | Done | TaC coating/sintering | Monday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields. |
|
475
|
Wednesday, March 04, 2020, 14:33 |
Aaron Schmidt | | | | Maintenance | PS swap out | The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: |
|
474
|
Tuesday, December 03, 2019, 08:24 |
Aaron Schmidt | | | LP-FEBIAD | In progress | Temperature mapping. | Tuesday, December 03, 2019, 08:15: Waterlines
opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23: |
|
473
|
Wednesday, November 27, 2019, 17:45 |
John Wong | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) |
|
|
472
|
Tuesday, November 26, 2019, 15:43 |
Anders Mjos | SiC | 42464-3 | HP-FEBIAD | Problems resolved | Water to vacuum leak on heat shield line | This morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum |
|
471
|
Tuesday, November 26, 2019, 15:21 |
Darwin Ortiz Rosales | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) | Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm |
|
470
|
Monday, November 25, 2019, 11:35 |
Aaron Schmidt | | | | In progress | Flex - line HS installed | Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line |
|
469
|
Saturday, November 23, 2019, 14:03 |
Darwin Ortiz Rosales | TaC | 42464-3 | HP-FEBIAD | Done | TaC coating/sintering | 12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped |
|
468
|
Friday, November 22, 2019, 18:32 |
Fernando Maldonado & Marla Cervantes | TaC | | HP-FEBIAD | In progress | TaC coating/sintering | Friday, November 22, 2019, 18:18:
|
|
467
|
Thursday, November 21, 2019, 08:10 |
Aaron Schmidt | SiC | | HP-FEBIAD | In progress | Temperature mapping. | Thursday, November 21, 2019, 08:09:
PS on. Leak issue resolved (Evap 2 Elog 466).
Vacuum @ 4.10e-07T. |
|
466
|
Friday, November 15, 2019, 13:26 |
Aaron Schmidt | SiC | | HP-FEBIAD | Problems resolved | Temp map testing - 1. (Leak issue) | HS 42752-5 - Setup for Temperature
mapping.
Friday, November 15, 2019, 13:26: |
|
465
|
Monday, November 04, 2019, 14:25 |
Darwin Ortiz Rosales | Endcaps | 40282-4 | TARGET BOAT | Done | |
Monday, November 04, 2019, 14:19
Each endcap is separated with |
|
464
|
Thursday, October 17, 2019, 13:53 |
Darwin Ortiz Rosales | TaC | 44062-3 | LP-SIS | In progress | TaC coating/sintering | Thursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers) |
|
463
|
Tuesday, October 08, 2019, 14:16 |
Aaron Schmidt | SiC | | HP-FEBIAD | In progress | Temp measurements. | Tuesday, October 08, 2019, 14:14: Remove
Flex line HS.
HS: 42752-1 |
|
462
|
Monday, October 07, 2019, 09:18 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | In progress | Sintering TaC coating on endcaps and springs | Friday, October 04, 2019, 11:37
Each endcap is separated with |
|
461
|
Thursday, October 03, 2019, 09:26 |
Darwin Ortiz Rosales | TaC | 44062-6 | LP-SIS | Done | TaC coating/sintering | Thursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers) |
|
460
|
Friday, September 27, 2019, 18:18 |
Marla Cervantes | Nb | | TARGET BOAT | Done | Conditioning NB samples for Edward | Wednesday, September 25, 2019, 18:06
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb |
|
459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
458
|
Tuesday, September 17, 2019, 13:25 |
Aaron Schmidt | | | LP-SIS | Problems resolved | Turbo pump / roughing troubleshoot. | Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23: |
|
457
|
Monday, September 16, 2019, 14:50 |
Aaron Schmidt | Ta | 44062-5 | LP-SIS | In progress | Conditioning Ta#59 | Ta#59 LP-SIS |
|
456
|
Wednesday, September 11, 2019, 15:16 |
Marla Cervantes | | 44062-4 | LP-SIS | Done | TaC coated target container calibration/conditioning | Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog |
|
455
|
Friday, September 06, 2019, 11:58 |
Darwin Ortiz Rosales | | 44062-4 | LP-SIS | Done | TaC coating/sintering | Friday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields. |
|
454
|
Wednesday, August 28, 2019, 05:59 |
Marla Cervantes | | 44062-2-SK | | Done | Graphite insert test | Wednesday, August 28, 2019, 06:00
A graphite insert (with conical |
|
453
|
Monday, August 12, 2019, 15:55 |
John Wong | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
|
|
452
|
Tuesday, July 30, 2019, 15:42 |
Darwin Ortiz Rosales | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, |
|
451
|
Wednesday, July 17, 2019, 11:13 |
Marla Cervantes | Nb | 40282-4 | TARGET BOAT | Done | Annealing of RRR-Nb test samples | Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. |
|
450
|
Monday, June 24, 2019, 08:42 |
Darwin Ortiz Rosales | SiC | 42464-4 | HP-FEBIAD | Done | Conditioning of BSiC discs |
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in including container |
|
449
|
Monday, June 17, 2019, 17:09 |
Marla Cervantes | | 49044-9 | LP-SIS | Done | Target container calibration/conditioning | Monday, June 17, 2019, 17:04
A LP-SIS target container was
wrapped with 3 heat shielding layers, |
|
448
|
Monday, June 17, 2019, 17:03 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Thursday, June 6, 2019, 16:43
A graphite insert with tantalum |
|
447
|
Tuesday, June 04, 2019, 08:41 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on endcaps and springs | Tuesday,
June 04, 2019, 08:36
|
|
446
|
Friday, May 24, 2019, 15:29 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Friday, May 24, 2019, 15:26
A graphite insert with tantalum
wires in its caps |
|
445
|
Tuesday, May 21, 2019, 18:01 |
Marla Cervantes | | 43943-1 | | Done | Graphite foil test | Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite |
|
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
443
|
Tuesday, May 14, 2019, 13:57 |
Aaron Schmidt | | | LP-FEBIAD | Done | Test FEBIAD | Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.) |
|
442
|
Friday, May 10, 2019, 16:58 |
Marla Cervantes | | 43943-1 | | Done | TaC coating/sintering for graphite insert test | Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets, |
|
441
|
Tuesday, April 30, 2019, 09:35 |
Darwin Ortiz Rosales | Empty | 43044-6 | LP-SIS | Done | TaC coating/sintering | Tuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields. |
|
440
|
Tuesday, April 23, 2019, 13:55 |
Aaron Schmidt | Ta | 43044-4 | LP-SIS | In progress | Conditioning Ta#58 | Ta#58 LP-SIS |
|
439
|
Wednesday, April 17, 2019, 09:06 |
Marla Cervantes | | 38295-10 | LP-FEBIAD | Done | Graphite insert test | Wednesday, April 17, 2019, 09:03
An uncoated target container was
loaded with a graphite insert and wrapped |
|
438
|
Tuesday, April 16, 2019, 13:40 |
Aaron Schmidt | | | | | Replace bottom insert on HS | Tuesday, April 16, 2019, 13:38: Replaced
the bottom insert on the heat shield.
Used small amount of isopropyl alcohol |
|
437
|
Sunday, April 07, 2019, 08:13 |
Marla Cervantes | | 43630-5 | | Done | Graphite insert test #5 | Sunday, April 07, 2019, 08:10
A graphite insert (with conical caps)
was loaded in tantalum tube previously coated |
|
436
|
Wednesday, April 03, 2019, 16:59 |
Marla Cervantes | TaC | 43630-5 | | Done | TaC coating/sintering for graphite insert test | Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with |
|
435
|
Monday, April 01, 2019, 16:35 |
Darwin Ortiz Rosales | | 43630-4 | | Done | TaC coating/graphite/sintering | Monday, April 01, 2019, 16:35
Container was coated with TaC and
a roll of graphite inserted inside the tube. |
|
434
|
Monday, March 18, 2019, 15:58 |
Darwin Ortiz Rosales | ZrC | 43044-5 | LP-SIS | Done | Sintering ZrC | Monday, March 18, 2019, 15:51
Total number of foils: 555
Total mass of material including |
|
433
|
Wednesday, March 13, 2019, 15:43 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test #4 | Wednesday, March 13, 2019, 15:41
An uncoated tantalum tube was loaded
with a graphite insert (with conical caps). |
|
432
|
Thursday, March 07, 2019, 09:22 |
Darwin Ortiz Rosales | Empty | 40282-4 | TARGET BOAT | Done | Transfer tube TaC coating (Legnaro) | Thursday, March 07, 2019, 09:09
Transfer tube from Legnaro was coated
with TaC. |
|
431
|
Thursday, February 21, 2019, 09:15 |
Darwin Ortiz Rosales | Empty | 42464-4 | HP-FEBIAD | Done | | Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields. |
|
430
|
Wednesday, February 13, 2019, 10:08 |
Darwin Ortiz Rosales | | 43630-1 | | Done | Graphite insert test 3b | Wednesday, February 13, 2019, 10:04
A previously coated tantalum |
|
429
|
Thursday, February 07, 2019, 15:20 |
Darwin Ortiz Rosales | Empty | 43630-1 | | Done | TaC coating/sintering | Thursday, February 07, 2019, 14:12
Tantalum tube coated with TaC and
wrapped with 3 layers of Ta heat-shielding. |
|
428
|
Wednesday, January 23, 2019, 13:06 |
Marla Cervantes | | 43630-2 | | Done | Graphite insert test #3 | Wednesday, January 23, 2019, 13:01
A previously coated tantalum |
|
427
|
Friday, January 18, 2019, 15:11 |
Darwin Ortiz Rosales | Empty | 43044-5 | LP-SIS | Done | TaC coating/sintering (training/online use) | Friday, January 18, 2019, 15:00
Container was coated with TaC and
wrapped with 3 Ta heat shields. |
|
426
|
Wednesday, January 16, 2019, 11:53 |
Marla Cervantes | TaC | 43630-2 | | Done | TaC coating/sintering for graphite insert test | Tuesday, January 15,
2018, 17:30 |
|
425
|
Thursday, December 20, 2018, 10:27 |
Marla Cervantes | | 43630-6 | | Done | Tantalum tube heating | Thursday, December 20, 2018, 10:24
A tantalum tube was |
|
424
|
Thursday, November 22, 2018, 10:19 |
Marla Cervantes | | 43630-7 | | Done | Graphite insert test #2 | Thursday, November 22, 2018, 10:12
A previously sintered tantalum tube
with 3 layers of shielding was loaded with |
|
423
|
Monday, November 19, 2018, 12:57 |
Marla Cervantes | Empty | 43630-7 | | Done | TaC coating/sintering for graphite insert test | Monday, November 19, 2018, 08:57
Tantalum tube was coated with |
|
422
|
Friday, November 02, 2018, 17:36 |
Marla Cervantes | Empty | 39530-1 | LP-FEBIAD | Done | Graphite insert test #1 | Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and |
|
421
|
Wednesday, October 31, 2018, 19:35 |
Marla Cervantes | TaC | 39530-1 | LP-FEBIAD | Done | TaC coating/sintering for graphite insert test | Wednesday, October 31, 2018, 19:35
Container is coated with TaC |
|
420
|
Thursday, October 25, 2018, 15:37 |
Marla Cervantes | TaC | 43044-7 | LP-SIS | Done | TaC coating/sintering for graphite insert test | Thursday, October 25, 2018, 10:36
Container is coated with TaC |
|
419
|
Tuesday, September 11, 2018, 10:47 |
Aaron Schmidt | | | | | Evap 2 step discrepancy | Tuesday, September 11, 2018, 10:45:
TGHT: 53.4 A TBHT: 57.75
Actual |
|
418
|
Monday, September 10, 2018, 15:09 |
Marla Cervantes | Empty | 42218-3 | LP-IG-LIS | Done | TaC coating/sintering for UC target container | Monday, September 10, 2018, 15:09
Container is coated with TaC |
|
417
|
Tuesday, September 04, 2018, 17:04 |
John Wong | Empty | | LP-SIS | Problems | TaC coating/sintering for UC target container | Tuesday, September 04, 2018, 16:58
Container is coated with TaC and
wrapped with Ta heat-shield ( 3 layers) |
|
416
|
Monday, August 20, 2018, 18:10 |
John Wong | np-SiC | 43044-1 | LP-SIS | Done | nano-SiC final conditioning | Monday, August 20, 2018, 17:58
14.9 g of np-SiC fibrous target discs
are loaded into the container (previously |
|
415
|
Wednesday, July 25, 2018, 17:33 |
John Wong | Empty | 43044-2 | LP-SIS | Done | TaC coating/sintering for UCx#24 | Wednesday, July 25, 2018, 17:32
Container is coated with TaC and
wrapped with 3 layers of Ta heat-shields. |
|
414
|
Tuesday, July 10, 2018, 16:43 |
John Wong | Empty | | LP-SIS | Done | For nano-SiC#1 | Tuesday, July 10, 2018, 16:40
Container was flashed with TaC solution
and let dry in air. |
|
413
|
Tuesday, July 03, 2018, 17:05 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch #3 | Tuesday, July 03, 2018, 17:02
49 discs/ 15.42g np-SiC fibrous discs
loaded into the tube container |
|
412
|
Thursday, June 21, 2018, 11:38 |
Aaron Schmidt | Ta | 42218-9 | HP-SIS | Done | Conditioning Ta#56 | Ta#56 HP-SIS target description:
|
|
411
|
Friday, June 08, 2018, 08:33 |
Aaron Schmidt | | | | Problems resolved | Chiller tripped / Alarm | Alarm noted on passing Hot Lab. RPG notified,
no radiological hazards. ISAC ops contacted,
drop in DI water last night. |
|
410
|
Wednesday, May 23, 2018, 15:21 |
Laura Lambert | Empty | | HP-FEBIAD-CTL | Done | Sintering TaC coating container for UCx#23 | Wednesday, May 16, 2018, 09:56
Container coated with TaC using |
|
409
|
Tuesday, May 08, 2018, 15:06 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch#2 | Tuesday, May 08, 2018, 15:02
22 np-SiC fibrous discs loaded in
the tube container (coated and sintered with |
|
408
|
Tuesday, May 01, 2018, 18:07 |
John Wong | np-SiC | Tube container | | Done | NanoSiC thermal treatment batch#1 | Tuesday, May 01, 2018, 18:06
21 fibrous discs of nanoSiC are loaded
into a tube container (coated/Sintered with |
|
407
|
Saturday, April 28, 2018, 16:12 |
John Wong | Empty | Tube container | | Done | TaC coating/sintering of Tube container | Saturday, April 28, 2018, 16:09
Container is coated with TaC and
wrapped with TaC heatshield. |
|
406
|
Wednesday, April 25, 2018, 07:21 |
Aaron Schmidt | | | | Done | HS swap evap 2 | Wednesday, April 25, 2018, 07:05: TGHT
& TBHT off
Wednesday, April 25, 2018, 07:15: |
|
405
|
Thursday, April 19, 2018, 12:38 |
Laura Lambert | Ta | 41177-3 | LP-SIS | Done | Round 2. Temp measurements for Aurelia target Ta#56 | Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description
and first round of heating. |
|
404
|
Tuesday, April 17, 2018, 10:24 |
Laura Lambert | Ta | 41177-3 | LP-SIS | Done | Conditioning Ta#56 back-up target/ Temp measurements for Aurelia | Tuesday, April 17, 2018, 10:20
Target consists of 470 discs. |
|
403
|
Thursday, March 08, 2018, 11:05 |
Marla Cervantes | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2 |
|
402
|
Wednesday, February 28, 2018, 15:18 |
Laura Lambert | Empty | 42218-13 | LP-SIS | Done | Sintering TaC coating on UCx#22 container | Wednesday, February 28, 2018, 15:16
Container coated with TaC using |
|
401
|
Monday, February 19, 2018, 14:16 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into |
|
400
|
Wednesday, December 13, 2017, 10:55 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2 |
|
399
|
Monday, December 11, 2017, 14:22 |
Laura Lambert | | | | Maintenance | Interlock limits updated to 500mTorr | Monday, December 11, 2017, 14:21
Dave updated evap2 interlock limits
to 500mTorr for TGHT and TBHT on friday |
|
398
|
Friday, December 08, 2017, 15:42 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on endcaps and springs |
|
|
397
|
Friday, December 08, 2017, 15:29 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems resolved | Sintering TaC coating on endcaps and springs |
|
|
396
|
Thursday, December 07, 2017, 11:56 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems | Sintering TaC coating on endcaps and springs |
|
|
395
|
Thursday, December 07, 2017, 10:03 |
Laura Lambert | Endcaps | | TARGET BOAT | In progress | Sintering TaC coating on endcaps and springs | Thursday, December 07, 2017, 09:57
Each endcap is wrapped in a |
|
394
|
Wednesday, November 29, 2017, 16:18 |
Laura Lambert | Empty | 39530-3 | LP-FEBIAD | Done | Temperature measurements for ARIEL | Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today
and currently pumping down. |
|
393
|
Thursday, November 23, 2017, 15:10 |
Laura Lambert | | 41882-4 | TARGET BOAT | Done | Graphite insert test | Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat. |
6x |
392
|
Tuesday, November 21, 2017, 13:55 |
Laura Lambert | Empty | 41882-4 | TARGET BOAT | Done | Sintering TaC coating on fully enclosed target boat for graphite test | Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing |
|
391
|
Monday, November 06, 2017, 18:25 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermal treatment npSiC Horn vs Probe samples - P74 | Monday, November 06, 2017, 18:21
Samples of Horn and Probe - npSiC.
see pg 74. |
|
390
|
Wednesday, October 04, 2017, 16:40 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermal treatment cast-pellet npSiC/PAN - det. sintering effect | Wednesday, October 04, 2017, 16:37
3 samples of npSiC/PAN cast-pellets,
see lab book p. 57 for details. |
|
389
|
Wednesday, September 27, 2017, 18:06 |
John Wong | np-SiC | | TARGET BOAT | Done | NS-npSiC & B3 pellets heat treatments | Wednesday, September 27, 2017, 18:05
3 samples from NS-npSiC pellets,
pressured at 10T (see lab book pg 53) |
|
388
|
Friday, September 15, 2017, 10:56 |
Laura Lambert | Ta | 42218-10 | HP-SIS | Done | Conditioning Ta#54 | Friday, September 15, 2017, 09:44
Target consists of 470 discs. |
|
387
|
Tuesday, September 12, 2017, 13:08 |
Aaron Schmidt | | | | | Window shutter added | Tuesday, September 12, 2017, 12:00:
The coated back window was changed
to a shuttered window. |
|
386
|
Monday, August 21, 2017, 17:32 |
John Wong | SiC | | TARGET BOAT | Done | Carbonization of sol-gel SiO2+CNT | Monday, August 21, 2017, 17:09
Two pellets of sol-gel SiO2+CNT were
produced. See lab book pg 44-46 for |
|
385
|
Tuesday, August 08, 2017, 15:00 |
Laura Lambert | Empty | | | Problems resolved | Wiring in PLC replaced re: IGP1 mis-communicating | Tuesday, August 08, 2017, 14:57
See elog i.d's #384 and #381
Investigated wiring in PLC. |
|
384
|
Friday, August 04, 2017, 14:09 |
Laura Lambert | | 40282-5 | TARGET BOAT | Done | Sintering La(OH)3/C pellets |
|
|
383
|
Friday, August 04, 2017, 10:52 |
Laura Lambert | | 40282-5 | TARGET BOAT | Problems | Sintering La(OH)3/C pellets |
|
|
382
|
Wednesday, August 02, 2017, 16:12 |
Marla Cervantes | | 40282-5 | | Done | Sintering La(OH)3/C pellets | Monday, July 31, 2017,
Pellets previously pressed by |
|
381
|
Tuesday, August 01, 2017, 15:34 |
Laura Lambert | | | | Problems | IGP1 mis-communicating with EPICS - PLC problem? | Monday, July 31, 2017, 15:24
Turned on BV and TP this afternoon.
Started ramping down, ~1min after |
|
380
|
Wednesday, July 19, 2017, 13:55 |
Marla Cervantes | | 40282-5 | TARGET BOAT | Done | Sintering La(OH)3/C discs | Wednesday, July 19, 2017, 13:44
Discs previously casted by Marla
and Pauline and weighed. |
|
379
|
Tuesday, July 18, 2017, 15:30 |
Laura Lambert | | | | Maintenance | Paddle wheel replacement for all evap2 water supplies | Tuesday, July 18, 2017, 15:26
Problems occured with TGHT water
supply paddle wheel stopped and therefore |
|
378
|
Monday, July 10, 2017, 17:36 |
John Wong | np-SiC | | TARGET BOAT | Problems | Water Sensor Problem, TGHT Tripped. (np-SiC fibrous Pellet: Applied pressure vs Density) | Monday, July 10, 2017, 17:28
Two np-SiC fibrous pellets with different
applied pressure: |
|
377
|
Tuesday, June 20, 2017, 16:07 |
Laura Lambert | Ta | 42218-6 | HP-SIS | Done | Conditioning Ta#53 | Tuesday, June 20, 2017, 15:58
Target consists of 470 discs. |
|
376
|
Friday, June 16, 2017, 15:14 |
Laura Lambert | SiC | 40282-4 | TARGET BOAT | Done | Sintering SiC pellets |
|
|
375
|
Friday, June 16, 2017, 10:42 |
Marla Cervantes | SiC | 40282-4 | TARGET BOAT | Done | Sintering SiC pellets |
|
|
374
|
Wednesday, June 14, 2017, 15:51 |
Laura Lambert | SiC | 40282-4 | TARGET BOAT | In progress | Sintering SiC pellets | Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla
and weighed. |
|
373
|
Monday, June 05, 2017, 15:20 |
Laura Lambert | Empty | 42218-15 | LP-SIS | Done | Sintering TaC coating on UCx#21 container | Monday, June 05, 2017, 15:20
Container coated with TaC using |
|
372
|
Tuesday, May 30, 2017, 14:40 |
Laura Lambert | Ta | 42218-14 | LP-SIS | Done | Conditioning Ta#52 | Tuesday, May 30, 2017, 14:36
Target consists of 400 discs. |
|
371
|
Tuesday, May 16, 2017, 11:57 |
Laura Lambert | SiC | 41369-10 | HP-FEBIAD-CTL | Done | Sintering SiC#36 | Tuesday, May 16, 2017, 10:56
Target container contains 460 |
|
370
|
Thursday, May 11, 2017, 11:36 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Done | Sintering SiC#36 - not SiC#36: now back-up [SiC#36 should be HP-FEBIAD-CTL!!!] |
|
|
369
|
Thursday, May 11, 2017, 11:30 |
Laura Lambert | | | | Maintenance | New Ion Gauge for IGP2 | Thursday, May 11, 2017, 11:25
IGP2 has been having problems where
sometimes it turns off and requires simply |
|
368
|
Thursday, May 11, 2017, 11:25 |
Laura Lambert | Empty | 41369-10 | HP-FEBIAD-CTL | Done | RUSH! Sintering TaC coated container for SiC#36 | Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong |
|
367
|
Thursday, May 11, 2017, 10:51 |
Laura Lambert | Empty | | TARGET BOAT | Done | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|
366
|
Wednesday, May 10, 2017, 21:33 |
Anders Mjos | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|
365
|
Wednesday, May 10, 2017, 16:07 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down | Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks |
|
364
|
Monday, May 08, 2017, 10:05 |
Laura Lambert | | | | Maintenance | Turbo pump control box replaced | Monday, May 08, 2017, 10:05
Turbo pump control box died last
week. |
|
363
|
Wednesday, May 03, 2017, 16:10 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Done | Sintering SiC#36 |
|
8x |
362
|
Wednesday, May 03, 2017, 16:09 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Problems resolved | Sintering SiC#36 |
|
|
361
|
Wednesday, May 03, 2017, 13:48 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Problems | Sintering SiC#36 |
|
|
360
|
Thursday, April 27, 2017, 15:54 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | In progress | Sintering SiC#36 | Thursday, April 27, 2017, 14:01
Target container contains 470 |
|
359
|
Thursday, April 20, 2017, 12:45 |
John Wong | np-SiC | | TARGET BOAT | In progress | Higher Temp Treament: B3-92Mpa pellets | Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta
boat and wrapped with heat shield (1 long |
|
358
|
Thursday, April 13, 2017, 12:03 |
Laura Lambert | SiC | | TARGET BOAT | Done | Sintering SiC pellets | Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is |
|
357
|
Thursday, April 06, 2017, 13:16 |
Laura Lambert | Empty | 40282-2 | TARGET BOAT | Done | Sintering TaC coating on evap1 target boat |
|
|
356
|
Thursday, April 06, 2017, 11:15 |
Laura Lambert | Empty | | TARGET BOAT | Problems resolved | Sintering TaC coating on evap1 target boat |
|
|
355
|
Thursday, April 06, 2017, 08:57 |
Laura Lambert | Empty | | TARGET BOAT | Problems | Sintering TaC coating on evap1 target boat |
|
|
354
|
Wednesday, April 05, 2017, 15:42 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on evap1 target boat | Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let |
|
353
|
Friday, March 31, 2017, 12:22 |
John Wong | np-SiC | | TARGET BOAT | In progress | Thermo test: B3 Pellets (13.3K-PSI) | Friday, March 31, 2017, 12:21
Two compressed pellets loaded into
the target boat and wrapped with Ta foil. |
|
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield
foils and installed by JW
Monday, March 13, 2017, 15:33: |
|
351
|
Saturday, March 11, 2017, 11:58 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test B3 Pellets | Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into
the container for thermo test. |
|
350
|
Tuesday, February 21, 2017, 15:21 |
Laura Lambert | Empty | 42218-1 | LP-IG-LIS | Done | sintering TaC coating on UCx#20 container | Tuesday, February 21, 2017, 15:19
Container coated with TaC using |
|
349
|
Tuesday, February 14, 2017, 15:48 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps and springs |
|
|
348
|
Tuesday, February 14, 2017, 15:44 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems resolved | Sintering TaC coating on Ta endcaps and springs |
|
|
347
|
Thursday, February 09, 2017, 23:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermotest: SiC-SiO2-Lys and SiC pellets | Thursday, February 09, 2017, 23:26
There are two types of samples being
test for thermal stability: |
|
346
|
Thursday, February 09, 2017, 11:49 |
Laura Lambert | | | | Maintenance | New heatshield with flexible water lines | Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday |
|
345
|
Monday, February 06, 2017, 11:17 |
Anders Mjos | | | | Problems resolved | IOC restart after power outagae | Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started. |
|
344
|
Friday, February 03, 2017, 14:18 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps and springs | Friday, February 03, 2017, 14:17
The endcaps are stacked together |
|
343
|
Tuesday, January 31, 2017, 16:03 |
Laura Lambert | Empty | 39530-10 | HP-FEBIAD | Done | Sintering TaC coated container for backup | Tuesday, January 31, 2017, 13:43
Container coated with TaC using |
|
342
|
Tuesday, December 20, 2016, 15:04 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | Tuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi |
|
341
|
Friday, December 16, 2016, 14:14 |
Laura Lambert | Ta | 39530-3 | LP-FEBIAD | Done | Conditioning Ta FEBIAD target for shutdown tests | Friday, December 16, 2016, 14:08
Target consists of 470 discs. |
|
340
|
Thursday, December 01, 2016, 16:08 |
Laura Lambert | Empty | 42218-12 | LP-SIS | Done | sintering TaC coating on UCx#19 container | Thursday, December 01, 2016, 16:06
Container coated with TaC using |
|
339
|
Tuesday, November 22, 2016, 15:58 |
Laura Lambert | Nb | 40282-3 | TARGET BOAT | Done | Conditioning Nb samples for Doug | Tuesday, November 22, 2016, 15:53
Target boat has a layer of niobium |
|
338
|
Friday, November 18, 2016, 17:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
|
|
337
|
Thursday, November 17, 2016, 11:15 |
Laura Lambert | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
|
|
336
|
Tuesday, November 15, 2016, 16:51 |
John Wong | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 | Tuesday, November 15, 2016, 16:48
Three samples were prepared
(see my logbook#1 page 3, preparing for carbonization). |
|
335
|
Monday, October 24, 2016, 17:52 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test of np-SiC raw powder | Monday, October 24, 2016, 17:43
Two samples were prepared and loaded
into the target boat with 1 layer of heat-shied |
|
334
|
Tuesday, October 18, 2016, 09:23 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Temperature measurements for Ta#50 |
|
|
333
|
Sunday, October 16, 2016, 17:55 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
332
|
Saturday, October 15, 2016, 12:42 |
Aurelia Laxdal | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 |
|
|
331
|
Thursday, October 13, 2016, 18:05 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Temperature measurements for Ta#50 | Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields. |
|
330
|
Thursday, October 13, 2016, 17:32 |
Laura Lambert | Ta | 41790-5 | LP-SIS | Done | Conditioning Ta#50 |
|
|
329
|
Wednesday, October 12, 2016, 21:18 |
John Wong | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 |
|
|
328
|
Friday, October 07, 2016, 16:42 |
Laura Lambert | Ta | 41790-5 | LP-SIS | In progress | Conditioning Ta#50 | Friday, October 07, 2016, 16:40
Target consists of 470 discs. |
|
327
|
Wednesday, September 28, 2016, 17:09 |
Laura Lambert | Empty | 41790-6 | LP-SIS | Done | sintering TaC coating on UCx container | Wednesday, September 28, 2016, 17:08
Container coated with TaC using |
|
326
|
Monday, September 26, 2016, 13:49 |
Laura Lambert | SiC | 39530-9 | HP-FEBIAD | Done | Sintering SiC#35 |
|
|
325
|
Thursday, September 22, 2016, 12:14 |
John Wong | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 |
|
|
324
|
Tuesday, September 20, 2016, 15:40 |
Laura Lambert | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 |
|
|
323
|
Monday, September 19, 2016, 18:48 |
John Wong | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 - Change OMEGA/MiKRON slopes |
|
|
322
|
Thursday, September 15, 2016, 16:37 |
Laura Lambert | SiC | 39530-9 | HP-FEBIAD | In progress | Sintering SiC#35 | Thursday, September 15, 2016, 16:23
Target container contains 487 |
|
321
|
Monday, September 12, 2016, 17:27 |
John Wong | Empty | 39530-9 | HP-SIS | Done | RUSH. Round 2: Sinering TaC coating |
|
|
320
|
Monday, September 12, 2016, 17:22 |
John Wong | Empty | 39530-9 | HP-SIS | Failed | TaC coating chipped off |
|
|
319
|
Wednesday, September 07, 2016, 15:02 |
John Wong | Empty | 39530-9 | HP-SIS | In progress | Sintering TaC coating container for SiC Target | Wednesday, September 07, 2016, 14:45
Container was previously coated with
TaC solution and wrapped with 1-full length |
|
318
|
Tuesday, August 30, 2016, 15:25 |
John Wong | SiC | 40860-3 | LP-IG-LIS | Problems | Conditioning SiC#34. Note about the p/s voltage |
|
|
317
|
Wednesday, August 24, 2016, 17:07 |
John Wong | SiC | 39814-V2-1 | LP-IG-LIS | Done | Sintering process for SiC#34 (2nd round) | Wednesday, August 24, 2016, 17:05
Target container was previously coated
with TaC and sintered up to 1900C at 420A/7.01V |
10x |
316
|
Tuesday, August 23, 2016, 12:15 |
John Wong | Empty | 39814-V2-1 | LP-IG-LIS | Done | sintering TaC coating on SiC#34 container...round2 |
|
|
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
314
|
Wednesday, August 17, 2016, 17:31 |
Laura Lambert | Empty | 39814-V2-1 | LP-IG-LIS | In progress | sintering TaC coating on SiC#34 container...round2 | Wednesday, August 17, 2016, 17:30
Container coated with TaC using |
|
313
|
Friday, August 12, 2016, 11:08 |
Laura Lambert | | | | Maintenance | NEW PUMP FOR GLOVE BOX | Wednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber |
|
312
|
Monday, August 08, 2016, 15:22 |
Laura Lambert | SiC | 40860-3 | LP-IG-LIS | Problems | Conditioning SiC#34 | Monday, August 08, 2016, 15:19
Previously sintered over weekend |
|
311
|
Tuesday, August 02, 2016, 13:56 |
Laura Lambert | SiC | 40860-3 | LP-IG-LIS | Done | Sintering SiC#34 | Tuesday, August 02, 2016, 13:41
Target container contains 471 |
|
310
|
Tuesday, July 26, 2016, 16:53 |
Laura Lambert | Ta | 41369-6 | HP-SIS | Done | Conditioning Ta#49 | Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened, |
|
309
|
Friday, July 15, 2016, 11:52 |
Laura Lambert | Empty | 40860-3 | LP-IG-LIS | Done | sintering TaC coating on SiC#34 container | Friday, July 15, 2016, 11:49
Container previously coated |
|
308
|
Monday, June 27, 2016, 11:08 |
Laura Lambert | Empty | 41790-3 | LP-SIS | Done | sintering TaC coating on UCx#17 container | Monday, June 27, 2016, 11:07
Container coated with TaC using |
|
307
|
Thursday, June 16, 2016, 11:01 |
Laura Lambert | SiC | 41369-4 | HP-SIS | Done | Conditioning SiC#33 - 1st beta SiC target! | Thursday, June 16, 2016, 10:59
Previously sintered over weekend
[see elog i.d 306] |
9x |
306
|
Thursday, June 16, 2016, 10:58 |
Laura Lambert | SiC | 41369-4 | HP-SIS | Done | Sintering SiC#33 - 1st beta-SiC target! |
|
|
305
|
Wednesday, June 15, 2016, 17:58 |
John Wong | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
|
|
304
|
Monday, June 13, 2016, 09:53 |
Laura Lambert | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
|
|
303
|
Friday, June 10, 2016, 16:30 |
John Wong | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! |
|
|
302
|
Thursday, June 09, 2016, 15:48 |
Laura Lambert | SiC | 41369-4 | HP-SIS | In progress | Sintering SiC#33 - 1st beta-SiC target! | Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
|
|
301
|
Tuesday, May 31, 2016, 11:10 |
John Wong | Empty | 41369-4 | HP-SIS | Done | sintering TaC coating on SiC#33 container |
|
|
300
|
Wednesday, May 25, 2016, 11:40 |
Laura Lambert | Empty | 41369-4 | HP-SIS | In progress | sintering TaC coating on SiC#33 container | Wednesday, May 25, 2016, 11:37
Container coated with TaC using |
|
299
|
Tuesday, May 24, 2016, 11:18 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
|
|
298
|
Friday, May 20, 2016, 08:54 |
Laura Lambert | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
|
|
297
|
Thursday, May 19, 2016, 14:38 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs | The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC. To do so, samples will |
|
296
|
Wednesday, May 11, 2016, 17:24 |
John Wong | np-SiC | | TARGET BOAT | Done | Temperature Treament of Nanofiber SiC/PAN | Wednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN
was prepared at UBC. |
|
295
|
Tuesday, May 10, 2016, 11:57 |
Laura Lambert | | 40282-3 | TARGET BOAT | Done | Conditioning Nb samples for Tobias |
|
|
294
|
Monday, May 09, 2016, 18:19 |
John Wong | | 40282-3 | TARGET BOAT | In progress | Conditioning Nb samples for Tobias |
|
|
293
|
Wednesday, May 04, 2016, 13:45 |
Laura Lambert | | 40282-3 | TARGET BOAT | In progress | Conditioning Nb samples for Tobias | Wednesday, May 04, 2016, 13:28
Target boat has a layer of niobium
foil on the bottom of the boat. |
|
292
|
Tuesday, May 03, 2016, 14:44 |
Laura Lambert | | | | | VACUUM PUMP REPLACEMENT | Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises. |
|
291
|
Tuesday, April 26, 2016, 13:50 |
Laura Lambert | Empty | 40860-2 | LP-IG-LIS | Done | sintering TaC coating on UCx#16 container | Tuesday, April 26, 2016, 13:32
Container coated with TaC using |
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
|
289
|
Thursday, April 07, 2016, 15:23 |
John Wong | SiC | | TARGET BOAT | Done | E-spun SiC/PAN thermal treatment | Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC. |
|
288
|
Wednesday, March 30, 2016, 11:32 |
John Wong | | Target boat | TARGET BOAT | Done | Thermostablization Polycarbosilane Fibers (UBC MTRL Samples) | Wednesday, March 30, 2016, 11:30
Polycarbosilane fibers were prepared
by UBC MTRL. |
|
287
|
Thursday, March 24, 2016, 12:05 |
John Wong | SiC | | TARGET BOAT | Done | Test#3: E-spin SiC with PAN | Thursday, March 24, 2016, 11:37
SiC powder (<1um) [10%] was mixed
with PAN solution [10%]. Solution was |
|
286
|
Thursday, March 24, 2016, 11:32 |
John Wong | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
|
|
285
|
Tuesday, March 22, 2016, 11:31 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
284
|
Monday, March 21, 2016, 18:57 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
283
|
Friday, March 18, 2016, 17:13 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
282
|
Monday, March 14, 2016, 19:22 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
281
|
Monday, March 14, 2016, 13:12 |
Anders Mjos | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
280
|
Monday, March 14, 2016, 09:22 |
Laura Lambert | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
|
|
279
|
Sunday, March 13, 2016, 14:58 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning | Started Ta#47 heating at Evap2 using the
autoramp program. The TGHT current is setup
to go to 300A (for now) and the TBHT to 230A |
|
278
|
Friday, February 26, 2016, 16:02 |
John Wong | np-SiC | | TARGET BOAT | Done | Test#2: Carbonizing sol-gel TEOS + Pan nanofibers | Friday, February 26, 2016, 15:44
5 samples were prepared at UBC MTRL
using Sol-gel tetraethyl orthosilicate (TEOS) |
|
277
|
Wednesday, February 24, 2016, 17:40 |
John Wong | Nb | | LP-SIS | Done | Bob/Tobi Nb samples | Thursday, February 25, 2016, 18:04 Wednesday,
February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped |
|
276
|
Thursday, February 18, 2016, 17:21 |
Laura Lambert | Empty | 40202-5 | TARGET BOAT | Done | sintered TaC coating on target boat [container style with no ionizer tube] |
|
|
275
|
Thursday, February 18, 2016, 13:22 |
John Wong | Empty | 40202-5 | TARGET BOAT | In progress | sintered TaC coating on target boat [container style with no ionizer tube] |
|
|
274
|
Tuesday, February 16, 2016, 14:02 |
Laura Lambert | Empty | 40202-5 | TARGET BOAT | In progress | sintered TaC coating on target boat [container style with no ionizer tube] | Tuesday, February 16, 2016, 14:19
coated with TaC yesterday and let
dry overnight. |
|
273
|
Friday, February 12, 2016, 11:09 |
Laura Lambert | Empty | 41077-1 | LP-SIS | Done | sintering TaC coated small center block container | Friday, February 12, 2016, 11:01
Container coated with |
|
272
|
Tuesday, January 19, 2016, 14:27 |
John Wong | np-SiC | targetboat (TaC coated) | TARGET BOAT | Done | SiC Nanofiber Heat Treatment | Tuesday, January 19, 2016, 14:19
SiC nanofiber was prepared at UBC
Material Engineering Sci. |
|
271
|
Thursday, January 14, 2016, 11:48 |
Laura Lambert | | | | Maintenance | Backing Pump Replaced | Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes |
|
270
|
Monday, January 11, 2016, 15:47 |
Laura Lambert | SiC | 41077-3 | LP-SIS | Done | Conditioning SiC test target for test stand measurements | Monday, January 11, 2016, 15:25
Small center block LP-SIS |
|
269
|
Friday, January 08, 2016, 11:15 |
Laura Lambert | Ta | 41369-5 | HP-SIS | Done | Temperature measurements |
|
|
268
|
Thursday, January 07, 2016, 09:19 |
Aurelia Laxdal | Ta | 41369-5 | HP-SIS | In progress | Temperature measurements | Temperature measurements in progress this
week for Ta HP-SIS.
See attachment for the current settings |
|
267
|
Wednesday, December 16, 2015, 10:22 |
Laura Lambert | Ta | 41369-5 | HP-SIS | Done | Conditioning back-up Ta Target & emissivity measurements | Wednesday, December 16, 2015, 10:09
Target consists of 505 discs. |
|
266
|
Monday, December 07, 2015, 09:06 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | emissivity measurements with no h.s on HP-FEBIAD container - round2 | Monday, December 07, 2015, 09:04
No heat shields. |
|
265
|
Tuesday, December 01, 2015, 11:35 |
Anders Mjos | Empty | 41077-5 | LP-SIS | In progress | Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR | Data from thermocouple attached.
Raw data and Excel sheet with plot. |
|
264
|
Monday, November 30, 2015, 15:38 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | emissivity measurements with no h.s on HP-FEBIAD container | Monday, November 30, 2015, 15:37
No heat shields. |
|
263
|
Monday, November 23, 2015, 14:36 |
Laura Lambert | Empty | 39530-9 | HP-FEBIAD | Done | temp measurements with no h.s on HP-FEBIAD container | Monday, November 23, 2015, 14:29
No heat shields. |
|
262
|
Tuesday, November 10, 2015, 14:34 |
Laura Lambert | SiC | 41077-3 | LP-SIS | Done | temp measurements with 3xTa h.s on LPSIS (small block) container with SiC | Tuesday, November 10, 2015, 14:20
Container previously sintered |
|
261
|
Monday, November 09, 2015, 14:22 |
Laura Lambert | | 41077-3 | LP-SIS | Done | Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) |
|
|
260
|
Monday, November 09, 2015, 12:56 |
John Wong | | 41077-3 | LP-SIS | In progress | Sintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04) |
|
|
259
|
Thursday, November 05, 2015, 16:20 |
Laura Lambert | | 41077-3 | LP-SIS | In progress | Sintering TaC coating on 'temporary endcaps' springs | Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded
into container for sintering. |
|
258
|
Monday, November 02, 2015, 16:29 |
Laura Lambert | Empty | 41077-3 | LP-SIS | Done | temp measurements with 3xTa h.s on LPSIS (small block) container | Monday, November 02, 2015, 16:28
Container previously sintered |
|
257
|
Monday, October 26, 2015, 16:17 |
Laura Lambert | Empty | 41077-3 | LP-SIS | Done | temp measurements with 2xTa h.s on LPSIS (small block) container | Monday, October 26, 2015, 16:16
Container previously sintered with
TaC coating and temperature measurements |
6x |
256
|
Monday, October 26, 2015, 16:14 |
Laura Lambert | Empty | 41077-3 | LP-SIS | Done | Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s |
|
|
255
|
Thursday, October 22, 2015, 17:10 |
John Wong | Empty | 41077-3 | LP-SIS | In progress | Sintering TaC on LPSIS (small block) container |
|
|
254
|
Thursday, October 22, 2015, 11:41 |
Laura Lambert | Empty | 41077-3 | LP-SIS | In progress | Sintering TaC on LPSIS (small block) container |
|
|
253
|
Wednesday, October 21, 2015, 17:39 |
John Wong | Empty | 41077-3 | LP-SIS | In progress | Sintering TaC on LPSIS (small block) container | Wednesday, October 21, 2015, 17:35
This container is prepared for a
backup UCx target (otherwise it will be used |
|
252
|
Thursday, October 08, 2015, 12:26 |
John Wong | Empty | 41077-5 | LP-SIS | In progress | Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR |
|
|
251
|
Tuesday, October 06, 2015, 15:18 |
John Wong | Empty | 41077-5 | LP-SIS | In progress | Test#1: Measuring temp with thermocouple (centre) & 2C-IR |
|
|
250
|
Thursday, September 24, 2015, 12:18 |
John Wong | Empty | 41077-5 | LP-SIS | Done | Sintering TaC coating container for UCx Target |
|
|
249
|
Thursday, September 24, 2015, 09:48 |
Laura Lambert | Empty | 41077-5 | | In progress | Sintering TaC coating container for UCx Target | Thursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks |
|
248
|
Thursday, September 10, 2015, 12:05 |
John Wong | SiC | 39530-5 | HP-FEBIAD | Done | Re-conditioning SiC#32 |
|
|
247
|
Thursday, September 10, 2015, 09:58 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
|
|
246
|
Wednesday, September 09, 2015, 18:24 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
|
|
245
|
Tuesday, September 08, 2015, 15:56 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
|
|
244
|
Wednesday, September 02, 2015, 11:28 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
|
|
243
|
Tuesday, September 01, 2015, 17:20 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 | Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. |
|
242
|
Thursday, August 27, 2015, 16:37 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating container for SiC Target |
|
|
241
|
Tuesday, August 25, 2015, 11:54 |
Laura Lambert | Empty | | HP-FEBIAD | In progress | Sintering TaC coating container for SiC Target | Tuesday, August 25, 2015, 11:50
Container coated with TaC using new
method: Ends tapped off, with liquid |
|
240
|
Monday, August 24, 2015, 12:58 |
John Wong | | | | Maintenance | Replacing turbo pump, IEVAP2TP1 | Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
The pump couldn't get on full speed |
|
239
|
Thursday, August 20, 2015, 17:15 |
John Wong | Ta | | HP-SIS | Done | Conditioning Ta#46 Target |
|
|
238
|
Thursday, August 20, 2015, 10:07 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
237
|
Wednesday, August 19, 2015, 17:26 |
John Wong | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
236
|
Tuesday, August 18, 2015, 16:02 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target | Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm. |
|
235
|
Thursday, August 06, 2015, 15:45 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps | Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil |
|
234
|
Tuesday, August 04, 2015, 12:04 |
Laura Lambert | Ta | | TARGET BOAT | Done | Test for homogeneity: Sintering TaC coating on a Ta tube |
|
|
233
|
Friday, July 31, 2015, 15:51 |
John Wong | Ta | | TARGET BOAT | In progress | Test for homogeneity: Sintering TaC coating on a Ta tube | Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The
inner of the tube was filled with TaC solution |
|
232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
230
|
Monday, July 13, 2015, 11:54 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps | Monday, July 13, 2015, 11:53
A Ta foil is placed in the target |
|
229
|
Monday, July 06, 2015, 16:30 |
Laura Lambert | Empty | 41369-2 | LP-SIS | Done | Sintering TaC coating container |
|
|
228
|
Monday, July 06, 2015, 12:07 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
227
|
Tuesday, June 30, 2015, 09:50 |
Laura Lambert | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
226
|
Monday, June 29, 2015, 23:42 |
John Wong | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container |
|
|
225
|
Monday, June 29, 2015, 16:18 |
Laura Lambert | Empty | 41369-2 | LP-SIS | In progress | Sintering TaC coating container | Monday, June 29, 2015, 16:17
Target container is coated with |
|
224
|
Monday, June 29, 2015, 07:05 |
John Wong | ZrC | 41177-2 | LP-SIS | Done | Sintering back-up ZrC |
|
|
223
|
Thursday, June 25, 2015, 16:20 |
Laura Lambert | ZrC | 41177-2 | LP-SIS | In progress | Sintering back-up ZrC | Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs |
|
222
|
Thursday, June 25, 2015, 16:13 |
Laura Lambert | SiC | 38817-6 | HP-SIS | Done | RUSH! SiC backup target undergoes sintering process |
|
|
221
|
Tuesday, June 23, 2015, 12:26 |
John Wong | SiC | 38817-6 | HP-SIS | In progress | RUSH! SiC backup target undergoes sintering process | Tuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. |
|
220
|
Tuesday, June 23, 2015, 10:18 |
Laura Lambert | Empty | 38817-6 | HP-SIS | Done | RUSH! Sintering TaC coated container for SiC |
|
|
219
|
Monday, June 22, 2015, 13:11 |
John Wong | Empty | 38817-6 | HP-SIS | In progress | RUSH! Sintering TaC coated container for SiC | Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped
with 3 layers of Ta heat-shield. Air |
|
218
|
Thursday, June 18, 2015, 11:39 |
Rick Maharaj | | | | | Installation of Extraction Electrode Insulator - New Material | Tuesday June 16, 2015
An Extraction Insulator ITD0381 made
from a different grade of AiN was installed |
|
217
|
Monday, June 15, 2015, 15:30 |
John Wong | Empty | 41177-2 | LP-SIS | Done | Re-Sintering TaC coating container for ZrC back-up |
|
|
216
|
Sunday, June 14, 2015, 09:40 |
John Wong | Empty | 40860-1 | LP-IG-LIS | Done | Re-Sintering TaC coating container for UCx |
|
|
215
|
Friday, June 12, 2015, 16:08 |
John Wong | Empty | 40860-1 | LP-IG-LIS | In progress | Re-Sintering TaC coating container for UCx |
|
|
214
|
Friday, June 12, 2015, 14:59 |
Laura Lambert | Empty | 40860-1 | LP-IG-LIS | In progress | Sintering TaC coating container for UCx |
|
|
213
|
Thursday, June 11, 2015, 16:10 |
Laura Lambert | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up |
|
|
212
|
Wednesday, June 10, 2015, 16:35 |
John Wong | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up |
|
|
211
|
Wednesday, June 10, 2015, 12:15 |
John Wong | Empty | 40860-1 | LP-IG-LIS | In progress | Sintering TaC coating container for UCx |
|
|
210
|
Tuesday, June 09, 2015, 10:44 |
Laura Lambert | Empty | 41177-2 | LP-SIS | In progress | Sintering TaC coating container for ZrC back-up | Tuesday, June 09, 2015, 9:16
Target container is coated with TaC.
No Ta-heat shields are used. |
|
209
|
Friday, June 05, 2015, 13:22 |
Laura Lambert | Empty | 40860-1 | LP-IG-LIS | In progress | Sintering TaC coating container for UCx |
|
|
208
|
Friday, June 05, 2015, 12:19 |
John Wong | Empty | | LP-IG-LIS | In progress | Sintering TaC coating container for UCx |
|
|
207
|
Thursday, June 04, 2015, 11:10 |
Laura Lambert | Empty | | LP-IG-LIS | In progress | Sintering TaC coating container for UCx | Thursday, June 04, 2015, 9:07
Container was sprayed with TaC and
let dry. |
|
206
|
Wednesday, June 03, 2015, 10:47 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
|
|
205
|
Tuesday, June 02, 2015, 13:05 |
John Wong | ZrC | 41177-1 | LP-SIS | Done | Conditioning ZrC#7 |
|
|
204
|
Monday, June 01, 2015, 18:09 |
John Wong | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 |
|
|
203
|
Friday, May 29, 2015, 11:29 |
Laura Lambert | ZrC | 41177-1 | LP-SIS | In progress | Conditioning ZrC#7 | Friday, May 29, 2015, 11:21
Total number of foils: 425 discs |
|
202
|
Friday, May 29, 2015, 11:18 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps - round 2 |
|
|
201
|
Thursday, May 28, 2015, 17:50 |
John Wong | Endcaps | 40282-5 | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps - round 2 |
|
|
200
|
Thursday, May 28, 2015, 11:36 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | In progress | Sintering TaC coating on Ta endcaps - round 2 | Thursday, May 28, 2015, 11:34
Endcaps were sintered [see elog#199] |
|
199
|
Thursday, May 28, 2015, 10:23 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps - not fully sintered |
|
|
198
|
Wednesday, May 27, 2015, 17:58 |
John Wong | Endcaps | 40282-5 | TARGET BOAT | In progress | Sintering TaC coating on Ta endcaps |
|
|
197
|
Tuesday, May 26, 2015, 13:57 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | In progress | Sintering TaC coating on Ta endcaps | Tuesday, May 26, 2015, 13:06
Endcaps were sprayed with TaC coating
and let dry. |
|
196
|
Tuesday, May 26, 2015, 13:05 |
Laura Lambert | Empty | 40282-5 | TARGET BOAT | Done | Sintering TaC coating on Ta target boat |
|
|
195
|
Monday, May 25, 2015, 17:08 |
John Wong | Empty | 40282-5 | TARGET BOAT | In progress | Sintering TaC coating on Ta target boat |
|
|
194
|
Friday, May 22, 2015, 11:44 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on Ta target boat | Friday, May 22, 2015, 11:43
A target boat was sprayed with |
|
193
|
Tuesday, May 19, 2015, 13:54 |
Laura Lambert | Empty | 41177-1 | LP-SIS | Done | Sintering TaC coating container for ZrC | Tuesday, May 19, 2015, 13:33
Target container is coated with |
|
192
|
Wednesday, May 13, 2015, 16:01 |
Laura Lambert | | 40282-4 | TARGET BOAT | Done | Sintering three different ZrC samples | Wednesday, May 13, 2015, 15:21
Three different samples of ZrC |
|
191
|
Friday, May 08, 2015, 15:56 |
Laura Lambert | | 40282-4 | TARGET BOAT | Done | Sintering four different ZrC samples |
|
|
190
|
Wednesday, May 06, 2015, 13:59 |
Laura Lambert | | 40282-4 | TARGET BOAT | Done | Sintering two different ZrC samples | Wednesday, May 06, 2015, 13:54
Two different samples of ZrC are
wrapped in graphite sheet and loaded into |
|
189
|
Monday, May 04, 2015, 17:26 |
John Wong | | 40282-4 | TARGET BOAT | In progress | Sintering four different ZrC samples |
|
|
188
|
Friday, May 01, 2015, 10:50 |
Laura Lambert | | 40282-4 | TARGET BOAT | In progress | Sintering four different ZrC samples | Friday, May 01, 2015, 10:27
Four different samples of ZrC are
loaded into a target boat. |
|
187
|
Thursday, April 23, 2015, 10:17 |
John Wong | SiC | 38817-7 | HP-SIS | Done | Sintering SiC#31 |
|
|
186
|
Friday, April 17, 2015, 16:14 |
Laura Lambert | SiC | 38817-7 | HP-SIS | In progress | Sintering SiC#31 | Friday, April 17, 2015, 16:01
Total number of foils: 520 discs |
|
185
|
Thursday, April 09, 2015, 09:38 |
Laura Lambert | Empty | 38817-7 | HP-SIS | Done | Sintering TaC coating container for SiC#32 | Thursday, April 09, 2015, 09:33
Target container is coated with |
|
184
|
Monday, March 16, 2015, 17:38 |
John Wong | Ta | 38817-5 | HP-SIS | Done | Conditioning Ta target |
|
|
183
|
Monday, March 09, 2015, 16:50 |
Laura Lambert | Ta | 38817-5 | HP-SIS | In progress | Conditioning Ta target | Monday, March 09, 2015, 16:47
Target consists of 400 discs.
Total packed length 3.4cm |
|
182
|
Thursday, February 19, 2015, 15:21 |
Laura Lambert | Empty | 41177-2 | LP-SIS | Done | Sintering TaC coating container for UCx#12 | Thursday, February 19, 2015, 15:19
Target container coated with TaC,
loaded in EVAP2. |
|
181
|
Wednesday, February 11, 2015, 16:12 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Conditioning graphite insert inside container - with heat shield | Wednesday, February 11, 2015, 16:10
Container loaded into EVAP2.
3xTa heat shields. |
|
180
|
Tuesday, February 10, 2015, 14:01 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Conditioning graphite insert inside container - no heat shield | Tuesday, February 10, 2015, 14:00
Container loaded into EVAP2 at noon.
no heat shields. |
|
179
|
Tuesday, February 10, 2015, 13:19 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Coating/Sintering TaC on target container - For Graphite Insert |
|
|
178
|
Thursday, February 05, 2015, 18:03 |
John Wong | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert |
|
|
177
|
Tuesday, February 03, 2015, 10:31 |
Laura Lambert | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert |
|
|
176
|
Monday, February 02, 2015, 16:33 |
John Wong | Empty | 41077-2 | LP-SIS | In progress | Coating/Sintering TaC on target container - For Graphite Insert | Monday, February 02, 2015, 16:28
Container is coated with TaC.
No Ta foil wrapped around. |
|
175
|
Thursday, January 22, 2015, 14:21 |
Anders Mjos | Empty | | | Problems resolved | CG1A replaced | See previous e-log entry
for details |
|
174
|
Wednesday, January 14, 2015, 13:46 |
Anders Mjos | Empty | | | Maintenance | Pumping down for water leak test | Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57: |
|
173
|
Thursday, December 11, 2014, 10:20 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:17
water supply and return valves closed
for lab closure over the holidays. |
|
172
|
Wednesday, November 26, 2014, 14:09 |
Laura Lambert | | | | Maintenance | OMEGA-IR dark patch and backing pump trip | Wednesday, November
26, 2014, 13:47 |
|
171
|
Wednesday, November 19, 2014, 15:10 |
Laura Lambert | Empty | 39530-2 | LP-FEBIAD | Done | test#1. direct voltage and OMEGA temperature measurements | Wednesday, November 19, 2014, 15:10
currently pumping down
Wednesday, November |
|
170
|
Monday, November 10, 2014, 13:55 |
Laura Lambert | Empty | | LP-SIS | Done | Sintering TaC coating container for UCx#11 [2nd container] | Monday, November 10, 2014, 13:51
target container was sprayed with
TaC on friday and sintered over the weekend. |
|
169
|
Tuesday, November 04, 2014, 16:21 |
John Wong | SiC | 39530-8 | HP-FEBIAD | Done | Testing the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE) |
|
|
168
|
Tuesday, November 04, 2014, 16:20 |
John Wong | SiC | | TARGET BOAT | In progress | TEST: Fabrication of SiC & Determine phase transformation 3C vs 6H | Tuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. |
|
167
|
Thursday, October 23, 2014, 15:38 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Testing the new OMEGA-IR2C on SiC#31 target | Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed |
|
166
|
Thursday, October 09, 2014, 17:41 |
John Wong | Nb | | TARGET BOAT | Done | Conditioning Nb targets (for Bob) | Thursday, October 09, 2014, 17:36
Target boat consists of 5 Nb discs.
Each disc is wrapped with Nb foil, and to |
|
165
|
Thursday, October 09, 2014, 16:37 |
John Wong | Empty | 40282-5 | LP-SIS | Done | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
|
|
164
|
Thursday, October 09, 2014, 15:59 |
John Wong | Nb | | TARGET BOAT | In progress | Conditioning Nb target (for Bob) | Thursday, October 09, 2014, 15:56
The target boat contains 5 samples
of Nb discs. Each disc is wrapped with |
|
163
|
Wednesday, October 08, 2014, 11:51 |
Laura Lambert | Empty | 40282-5 | LP-SIS | Done | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
|
|
162
|
Monday, October 06, 2014, 12:17 |
John Wong | Empty | 40282-5 | LP-SIS | In progress | Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) |
|
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
|
|
160
|
Thursday, October 02, 2014, 11:52 |
Laura Lambert | Empty | 40282-5 | LP-SIS | In progress | Sintering TaC coating container for UCx#11 | Thursday, October 02, 2014, 11:51
Target container sprayed with TaC,
currently drying in fume hood |
|
159
|
Thursday, October 02, 2014, 11:26 |
John Wong | Empty | | | Maintenance | Broken insulators | Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the |
|
158
|
Thursday, September 25, 2014, 17:35 |
John Wong | Endcaps | 40282-5 | TARGET BOAT | Done | Sintering Ta-coated endcaps (temp measured) | Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated
endcaps. The caps are stacked together. |
|
157
|
Tuesday, September 23, 2014, 18:32 |
John Wong | Empty | 40282-5 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating (with Temp measurement) |
|
|
156
|
Tuesday, September 23, 2014, 15:02 |
Laura Lambert | Empty | 40282-5 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Tuesday, September 23, 2014, 15:00
A new target boat [new design with
no end caps] was sprayed with TaC coating |
|
155
|
Thursday, September 11, 2014, 14:23 |
Laura Lambert | | 40282-3 | TARGET BOAT | Failed | Sintering TaC coated end caps | Thursday, September 11, 2014, 13:14
The target container end caps were
coated with TaC spray and let dry. |
|
154
|
Friday, August 08, 2014, 15:16 |
Laura Lambert | Ta | 38817-9 | HP-SIS | Done | Conditioning Ta target |
|
|
153
|
Thursday, August 07, 2014, 10:13 |
Laura Lambert | | | TARGET BOAT | Failed | Sintering TaC coated end caps |
|
|
152
|
Wednesday, August 06, 2014, 16:10 |
John Wong | Ta | 38817-9 | HP-SIS | In progress | Conditioning Ta target | Wednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs.
Total packed length 4.5cm |
|
151
|
Tuesday, August 05, 2014, 17:20 |
John Wong | | | TARGET BOAT | In progress | Sintering TaC coated end caps |
|
|
150
|
Tuesday, August 05, 2014, 13:13 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coated end caps | Tuesday, August 05, 2014, 12:02
The target container end caps were
coated with TaC spray and let dry. |
|
149
|
Tuesday, August 05, 2014, 12:01 |
Laura Lambert | | 40282-3 | LP-SIS | Done | ZrC #6 conditioning |
|
|
148
|
Friday, August 01, 2014, 13:27 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | Target was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
|
|
147
|
Friday, August 01, 2014, 11:47 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | The maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A |
|
146
|
Tuesday, July 29, 2014, 11:23 |
John Wong | | 40282-3 | LP-SIS | In progress | Sintering ZrC# 6 target |
|
|
145
|
Monday, July 28, 2014, 15:06 |
Laura Lambert | | 40282-3 | LP-SIS | In progress | Sintering ZrC# 6 target | Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite |
|
144
|
Monday, July 28, 2014, 10:52 |
Laura Lambert | Empty | 40282-3 | LP-SIS | Done | Sintering TaC coated target container |
|
|
143
|
Wednesday, July 23, 2014, 15:07 |
John Wong | Empty | 40282-3 | LP-SIS | In progress | Sintering TaC coated target container | Wednesday, July 23, 2014, 15:07
Target container is coated with TaC.
No Ta-heat shields are used. |
|
142
|
Tuesday, June 24, 2014, 23:57 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|
141
|
Monday, June 23, 2014, 09:47 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|
140
|
Friday, June 20, 2014, 16:22 |
John Wong | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target |
|
|
139
|
Friday, June 20, 2014, 12:01 |
Laura Lambert | SiC | 39530-8 | HP-FEBIAD | In progress | Conditioning SiC#31 target | Friday, June 20, 2014, 11:14
Made from batch's: oct 23/2013, oct
31/2013 and june 2012 |
|
138
|
Tuesday, June 17, 2014, 13:20 |
Laura Lambert | Empty | 39530-8 | HP-FEBIAD | Done | Sintering TaC coating container for SiC#30 part 2 | Tuesday, June 17, 2014, 13:11
Target container is coated with TaC.
Container is wrapped with 3x Ta-heat |
|
137
|
Tuesday, June 17, 2014, 10:14 |
Laura Lambert | Ta | 40282-2 | LP-SIS | Done | Conditioning Ta#43 target |
|
|
136
|
Monday, June 16, 2014, 17:42 |
John Wong | Ta | 40282-2 | LP-SIS | In progress | Conditioning Ta#43 target |
|
|
135
|
Friday, June 13, 2014, 14:57 |
Laura Lambert | Ta | 40282-2 | LP-SIS | In progress | Conditioning Ta#43 target | Friday, June 13, 2014, 14:53
Container is filled with 400 discs
of Ta foils; target length = 5.2cm; |
|
134
|
Monday, June 09, 2014, 17:15 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Target boat is now being cooled at
1 A/min from the starting point (616 A) down
to 0 A. |
|
133
|
Monday, June 09, 2014, 13:56 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Manually changed current from 500 to 615
A, monitoring the temperature. Temperature
went from 1657 C up to 1838 C. Pressure increased |
|
132
|
Friday, June 06, 2014, 16:01 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Auto-ramp started. Max current = 500 A,
voltage = 11.05 V. Current is being increased
at 2 A/min. In the first 20 minutes, the |
|
131
|
Friday, May 30, 2014, 13:15 |
Cameron Hodgins | | | | In progress | Sintering several carbides on tantalum foil backing | Pressure down to 7.1e-7 Torr. Water
valve to heat shield was opened; pressure
remained stable. |
|
130
|
Thursday, May 29, 2014, 18:16 |
Cameron Hodgins | | | TARGET BOAT | In progress | Sintering several carbides on tantalum foil backing | Purpose: Sinter one sample of each of TiC,
VC, Cr3C2, ZrC, NbC, Mo2C, TaC, and WC on
5x10 mm tantalum foil to see if the samples |
|
129
|
Thursday, April 24, 2014, 18:13 |
John Wong | | | TARGET BOAT | Done | Tests: Sintering carbon Mesh coated with WC | Thursday, April 24, 2014, 17:25
The purpose of this experiment is
to see if the carbon mesh is suitable for |
|
128
|
Thursday, March 27, 2014, 18:04 |
John Wong | | | TARGET BOAT | In progress | Studying WC sintering on Ta surface | Thursday, March 27, 2014, 17:38
TEST #1
WC slurry was prepared in non-aqueous |
|
127
|
Wednesday, March 26, 2014, 18:23 |
John Wong | TiC | 38817-8 | HP-SIS | Done | Sintering TiC#4 |
|
|
126
|
Wednesday, March 26, 2014, 11:07 |
Laura Lambert | TiC | 38817-8 | HP-SIS | In progress | Sintering TiC |
|
|
125
|
Friday, March 21, 2014, 16:18 |
John Wong | TiC | 38817-8 | HP-SIS | In progress | Sintering TiC | Friday, March 21, 2014, 16:09
Target container is loaded with 360
Discs of TiC. |
|
124
|
Monday, March 10, 2014, 11:52 |
John Wong | | | | Problems resolved | The Chiller is down | Monday, March 10, 2014, 11:45
The chiller tripped off on March
7, 2014. |
|
123
|
Monday, March 10, 2014, 11:45 |
John Wong | | | | Maintenance | Replaced Backing Pump hose | Monday, March 10, 2014, 11:44
Rick replaced the backing pump hose
from 1.5" to 2.0" for better flow. |
|
122
|
Friday, March 07, 2014, 22:25 |
John Wong | | 40282-3 | TARGET BOAT | Problems | Sintering TaC coated end caps |
|
|
121
|
Friday, March 07, 2014, 11:46 |
Laura Lambert | | 40282-3 | TARGET BOAT | In progress | Sintering TaC coated end caps | Friday, March 07, 2014, 11:41
The target container end-caps were
sintered previously, but did not fully complete |
|
120
|
Friday, March 07, 2014, 10:34 |
Anders Mjos | | | | Problems resolved | TGHT2 water flow signal | There was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be |
|
119
|
Tuesday, February 25, 2014, 16:10 |
Laura Lambert | | 40282-3 | TARGET BOAT | Done | Sintering TaC coated end caps | Tuesday, February 25, 2014, 16:08
The target containers end-caps |
|
118
|
Tuesday, February 18, 2014, 12:19 |
Laura Lambert | Empty | 40282-3 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating | Tuesday, February 18, 2014, 12:12
A new target boat was sprayed with
TaC coating and let dry. |
|
117
|
Tuesday, February 11, 2014, 13:49 |
Laura Lambert | Empty | 38817-8 | HP-SIS | Done | Sintering TaC coating container for TiC | Tuesday, February 11, 2014, 13:43
Target container is coated with TaC
and wrapped with 3-Ta heat shields. |
|
116
|
Friday, January 31, 2014, 12:10 |
Laura Lambert | Empty | 39165-10 | LP-SIS | Done | Sintering TaC coating container for Ta? | Friday, January 31, 2014, 11:28
Target container is coated with TaC.
The container is wrapped with 3 x |
|
115
|
Tuesday, January 28, 2014, 15:46 |
Laura Lambert | | 40282-4 | TARGET BOAT | Failed | Sintering TaC coated end caps | Tuesday, January 28, 2014, 15:43
The target containers end-caps were
coated with TaC spray and let dry. |
|
114
|
Tuesday, January 28, 2014, 13:09 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
113
|
Tuesday, January 28, 2014, 11:57 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
112
|
Monday, January 27, 2014, 10:59 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
111
|
Friday, January 24, 2014, 14:25 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
110
|
Thursday, January 23, 2014, 16:22 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | Problems resolved | Sintering Ta target boat with TaC coating |
|
|
109
|
Wednesday, January 22, 2014, 18:22 |
John Wong | Empty | 40282-4 | TARGET BOAT | Problems | Sintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem) |
|
|
108
|
Wednesday, January 22, 2014, 15:13 |
John Wong | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
|
|
107
|
Wednesday, January 22, 2014, 13:46 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
|
|
106
|
Wednesday, January 22, 2014, 09:49 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
|
|
105
|
Tuesday, January 21, 2014, 11:56 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
|
|
104
|
Tuesday, January 21, 2014, 11:33 |
Laura Lambert | Empty | 40282-4 | TARGET BOAT | | Sintering Ta target boat with TaC coating |
|
|
103
|
Monday, January 20, 2014, 16:35 |
Laura Lambert | Empty | Ta-Target boat | | | Sintering Ta target boat with TaC coating | Monday, January 20, 2014, 16:32
A new target boat was sprayed with
TaC coating and let dry this morning. |
|
102
|
Monday, January 20, 2014, 16:30 |
Laura Lambert | Empty | 39165-9 | LP-SIS | Done | Sintering TaC coating container |
|
|
101
|
Friday, January 17, 2014, 12:52 |
John Wong | Empty | 39165-9 | LP-SIS | In progress | Sintering TaC coating container |
|
|
100
|
Friday, January 17, 2014, 10:18 |
Laura Lambert | Empty | 39165-9 | LP-SIS | In progress | Sintering TaC coating container |
|
|
99
|
Friday, January 17, 2014, 09:34 |
John Wong | Empty | 39165-9 | LP-SIS | In progress | Sintering TaC coating container |
|
|
98
|
Thursday, January 16, 2014, 13:06 |
Laura Lambert | Empty | 39165-9 | LP-SIS | In progress | Sintering TaC coating container |
|
|
97
|
Wednesday, January 15, 2014, 17:45 |
John Wong | Empty | 39165-9 | LP-SIS | In progress | Sintering TaC coating container | Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
No Ta-heat shields are used. |
|
96
|
Thursday, November 07, 2013, 09:38 |
Anders Mjos | | | | Problems resolved | Heat Shield cooling line twisted | See attached photo.
The Heat Shield has been taken to
the Machine Shop for repair. |
|
95
|
Wednesday, November 06, 2013, 17:36 |
John Wong | TaC | Target Boat #2 | | In progress | Testing TaC matrix coating | The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives. The coating solution will |
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
|
|
93
|
Friday, November 01, 2013, 17:20 |
Anders Mjos | | | | Problems | Backing pump needs new filter | The source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter |
|
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|
91
|
Friday, October 04, 2013, 16:21 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on a LP target container to be used for C-grv tube test | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
|
90
|
Thursday, September 26, 2013, 15:17 |
John Wong | Empty | 39814-VI-? | LP-IG-LIS | Done | Sintering empty target oven coated with TaC for UCx#8 | Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is
coated with TaC. |
|
89
|
Monday, September 23, 2013, 16:18 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
88
|
Friday, September 20, 2013, 14:59 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
87
|
Thursday, September 19, 2013, 17:02 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
86
|
Thursday, September 19, 2013, 11:56 |
Laura Lambert | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) |
|
|
85
|
Tuesday, September 17, 2013, 11:21 |
John Wong | Nb | target boat #3 (brand new!) | | | Nb thermo treatment (Bob's samples) | Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs.
3 discs are wraps with 0.001" thin of |
|
84
|
Thursday, August 29, 2013, 11:53 |
Laura Lambert | | targetboat (TaC coated) | | Done | Sintering TaC coated regular caps |
|
|
83
|
Tuesday, August 27, 2013, 17:01 |
John Wong | | targetboat (TaC coated) | | Done | Sintering TaC coated regular caps | Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated
endcaps (brown) and some partial sinterred |
|
82
|
Wednesday, August 21, 2013, 12:30 |
John Wong | Ta | 38817-10 | HP-SIS | Done | Conditioning Ta target | Wednesday, August 21, 2013, 12:28
Container is filled with 400 discs
of Ta foils, and wrapped with 3 layers of |
|
81
|
Thursday, August 08, 2013, 17:28 |
John Wong | NiO | 39530-6 | HP-FEBIAD | Done | Sintering NiO # 2 |
|
|
80
|
Thursday, August 08, 2013, 15:41 |
Laura Lambert | NiO | 39530-6 | HP-FEBIAD | In progress | Sintering NiO # 2 | Thursday, August 08, 2013, 15:19
NiO target materials loaded into
the container yesterday. |
|
79
|
Monday, July 22, 2013, 15:03 |
John Wong | Empty | 38634-7 | LP-SIS | Done | Sintering empty target oven coated with TaC for UCx#7 | Monday, July 22, 2013, 15:00
Target container is coated with TaC
- this container will be used for UCx#7. |
|
78
|
Tuesday, June 18, 2013, 16:40 |
John Wong | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 |
|
|
77
|
Monday, June 17, 2013, 16:59 |
Laura Lambert | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 | Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with |
|
76
|
Tuesday, May 28, 2013, 17:50 |
John Wong | | Target Boat #2 | | Done | Sintering TaC coated end caps | Tuesday, May 28, 2013, 17:36
The target containers endcaps were
coated with TaC solution and let dry. |
|
75
|
Tuesday, May 14, 2013, 17:15 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | SinteringTaC coating | Tuesday, May 14, 2013, 17:04
Target oven is coated with TaC, and
wrapped with 3-Ta heat shields. |
|
74
|
Monday, May 13, 2013, 17:17 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 |
|
|
73
|
Monday, May 13, 2013, 12:53 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 |
|
|
72
|
Tuesday, May 07, 2013, 16:53 |
Nikita Bernier | BeO | | | Done | Sintering BeO pellets #6 | Tuesday, May 07, 2013, 16:48
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified. |
|
67
|
Friday, April 19, 2013, 09:39 |
Rick Maharaj | Empty | | | Done | thermocouple Feedthru | A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator |
|
66
|
Thursday, April 11, 2013, 14:20 |
John Wong | Empty | 39165-6 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#6 | Monday, April 08, 2013, 17:39
Target container is coated with TaC;
the container will be used for the UCx#6 |
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated
to 580A / 300A |
|
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached
PDF for photos) |
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing |
|
59
|
Monday, March 04, 2013, 17:41 |
John Wong | Empty | LP-SIS RFQ ver 2.0 | | | Testing LPSIS RFQ ver 2.0 | Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS. The container will be |
|
58
|
Friday, February 22, 2013, 15:55 |
John Wong | SiC | | LP-SIS | Done | Sintering SiC#28-RFQ | Friday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up |
|
57
|
Monday, February 18, 2013, 16:43 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on the RFQ target container | Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered. No |
|
56
|
Tuesday, January 22, 2013, 16:14 |
John Wong | | | LP-SIS | Done | Heating RFQ components & measuring temperatures | Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year. |
|
55
|
Friday, January 11, 2013, 15:16 |
Anders Mjos | | | | Maintenance | Replace terminal insulator |
|
|
54
|
Friday, January 11, 2013, 14:00 |
John Wong | Empty | Ta-Target boat | | Done | Testing QMS & thermocouples | Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with |
|
53
|
Friday, January 11, 2013, 11:16 |
John Wong | | | | Maintenance | Replace terminal insulator | Friday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. |
|
52
|
Tuesday, October 16, 2012, 14:18 |
John Wong | TiC | 39165-4 | LP-SIS | Done | Sintering TiC#3 | Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of
TiC (with 1 mole of graphite) backed on C-grv |
|
51
|
Wednesday, October 10, 2012, 16:37 |
John Wong | Empty | 39165-4 | LP-SIS | Done | Coating target oven /w TaC & sintering for TiC#3 | Wednesday, October 10, 2012, 16:35
Target container is coated with TaC.
No Ta-heat shields are used. |
|
50
|
Friday, September 28, 2012, 12:59 |
Nikita Bernier | BeO | | | Done | Sintering BeO Pellets #4 |
|
|
49
|
Wednesday, September 26, 2012, 15:14 |
Nikita Bernier | BeO | | | Done | Sintering BeO Pellets #4 | Wednesday, September 26, 2012, 15:07
|
|
48
|
Wednesday, September 26, 2012, 15:06 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating |
|
|
47
|
Monday, September 24, 2012, 18:09 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating |
|
|
46
|
Monday, September 24, 2012, 15:12 |
Nikita Bernier | TaC | | | Done | Sintering Ta foil with TaC coating | Monday, September 24, 2012, 15:01
The target boat with TaC coating
is being used again. The inside of the boat |
|
45
|
Wednesday, August 22, 2012, 17:36 |
John Wong | Empty | 39165-5 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#5 | Wednesday, August 22, 2012, 17:25
Note: LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered |
|
44
|
Tuesday, August 14, 2012, 17:11 |
John Wong | | | | Failed | Sintering Ta2O5 coating on Ta foil failed |
|
|
43
|
Tuesday, August 14, 2012, 15:57 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Done | Testing endcaps inserted /w the new expansion tool | Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May
2011 with the Evaporator#1. The target |
|
42
|
Tuesday, August 14, 2012, 15:11 |
John Wong | | | | Maintenance | Replacing Cu-heatshield insulators | Tuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during |
|
41
|
Monday, August 13, 2012, 13:50 |
Nikita Bernier | | | | Done | Sintering Ta foil with TaO coating |
|
|
40
|
Saturday, August 11, 2012, 19:21 |
Nikita Bernier | | | | Done | Sintering Ta foil with TaO coating |
|
|
39
|
Friday, August 10, 2012, 19:57 |
Nikita Bernier | | | | Done | Sintering Ta foil with TaO coating | Friday, August 10, 2012, 19:54
|
|
38
|
Monday, July 30, 2012, 15:42 |
John Wong | | | | Problems | Chiller maybe leaky | Monday, July 30, 2012, 15:38
The evaporator was used for the processing
the NiO target for 8 days and it was discovered |
|
37
|
Sunday, July 22, 2012, 20:51 |
John Wong | NiO | 38481-7 | HP-FEBIAD | Done | Sintering NiO#1 | Sunday, July 22, 2012, 20:30
The NiO target materials were loaded
into the container today. |
|
36
|
Thursday, July 19, 2012, 17:05 |
John Wong | Empty | 37918-3 | LP-FEBIAD | Done | Coating target oven /w TaC & sintering for UCx#5 | Thursday, July 19, 2012, 16:58
The target container was coated with
TaC. |
|
35
|
Tuesday, July 17, 2012, 16:00 |
John Wong | | targetboat (TaC coated) | | Done | Sintering TaC coated regular- & D-endcaps | Tuesday, July 17, 2012, 15:45
Target boat is filled with TaC coated
regular- and D-endcaps. |
|
34
|
Thursday, July 12, 2012, 17:55 |
John Wong | NiO | targetboat (TaC coated) | | Maintenance | NiO development- test#2 | Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm, |
|
33
|
Thursday, June 21, 2012, 18:13 |
John Wong | NiO | Ta target boat | | Failed | NiO development - Container broke! |
|
|
32
|
Wednesday, June 20, 2012, 22:33 |
John Wong | NiO | Ta target boat | | Done | NiO development |
|
|
31
|
Wednesday, June 20, 2012, 17:29 |
Nikita Bernier | NiO | Ta target boat | | Done | NiO development | Wednesday, June 20, 2012, 17:23
New Target boat, with no coating,
wrapped with a 0.002 inches thick Ta foil, |
|
30
|
Monday, June 11, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Problems | End caps vaporized |
|
|
29
|
Tuesday, May 29, 2012, 15:43 |
Nikita Bernier | BeO | Target boat #2 | | Failed | Sintering BeO pellets #3 |
|
|
28
|
Monday, May 28, 2012, 11:15 |
John Wong | | | | Problems | Chiller is leaking water | Monday, May 28, 2012, 11:08
It was discovered this morning that
the Evaporator #2 chiller was leaking water |
|
27
|
Wednesday, May 23, 2012, 17:45 |
John Wong | BeO | Target boat #2 | | Done | Sintering BeO pellets #3 |
|
|
26
|
Tuesday, May 22, 2012, 16:45 |
Nikita Bernier | BeO | Target boat #2 | | Done | Sintering BeO pellets #3 |
|
|
25
|
Tuesday, May 22, 2012, 15:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
24
|
Tuesday, May 22, 2012, 12:15 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
23
|
Friday, May 18, 2012, 13:17 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
22
|
Friday, May 18, 2012, 12:19 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
21
|
Wednesday, May 16, 2012, 14:04 |
John Wong | | | | Problems resolved | TBHT cooling line leaky |
|
|
20
|
Tuesday, May 15, 2012, 17:06 |
John Wong | | | | Problems resolved | TBHT power supply faulty | Tuesday, May 15, 2012, 17:03
The tube heater power supply current
readback and setpoint are not matching. Ray |
|
19
|
Tuesday, May 15, 2012, 17:03 |
John Wong | | | | Problems | TBHT cooling line leaky | Tuesday, May 15, 2012, 17:00
It was found that there were water
droplets from the TBHT cooling line. The |
|
18
|
Tuesday, May 15, 2012, 14:00 |
John Wong | | | | Maintenance | Installed a new stainless metal heat shield | Tuesday, May 15, 2012, 13:45
It was discovered that one of the
insulators that supported the target module |
|
17
|
Tuesday, May 15, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target | Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010. The target consists of |
|
16
|
Thursday, April 05, 2012, 16:40 |
Nikita Bernier | BeO | Target boat #2 | | Done | Sintering BeO pellets #3 | Thursday, April 05, 2012, 16:31
Target boat contains 6 BeO |
|
15
|
Tuesday, April 03, 2012, 09:00 |
John Wong | Empty | Ta-target boat #2 | | | Sintering Ta-target boat with TaC coating | Tuesday, April 03, 2012, 08:54
Yesterday, a new target boat was
sprayed with TaC coating and let dried. |
|
14
|
Monday, April 02, 2012, 16:26 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering new BeO pellets |
|
|
13
|
Friday, March 30, 2012, 23:21 |
John Wong | BeO | Target boat #1 | | Done | Sintering new BeO pellets |
|
|
12
|
Thursday, March 29, 2012, 22:44 |
John Wong | BeO | Target boat #1 | | Done | Sintering new BeO pellets |
|
|
11
|
Thursday, March 29, 2012, 19:30 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering new BeO pellets | Thursday, March 29, 2012, 19:17
|
|
10
|
Thursday, March 22, 2012, 17:56 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
9
|
Thursday, March 22, 2012, 00:34 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
8
|
Tuesday, March 20, 2012, 14:39 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
7
|
Tuesday, March 20, 2012, 14:35 |
John Wong | | | | Done | Evap#2 Backing up muffler not connected to the exhaust system. | Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust |
|
6
|
Monday, March 19, 2012, 17:10 |
Nikita Bernier | BeO | Target boat #1 | | Done | Sintering BeO pellets | Monday, March 19, 2012, 17:04
Target boat contains 4 BeO pellets |
|
5
|
Thursday, March 01, 2012, 14:42 |
John Wong | | | | | IEVAP2:TGHT/TBHT max current setpoint issue | Thursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT
maximum current setpoints on the vacuum page |
|
4
|
Tuesday, February 28, 2012, 11:00 |
John Wong | Empty | Test oven | LP-SIS | Done | Measuring temperatures, currents & voltages | Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield, |
|
3
|
Monday, February 13, 2012, 16:24 |
John Wong | | | | Done | Evaporator #2 Commissioned | Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
See attachment#1 for the commissioning |
|
2
|
Thursday, July 21, 2011, 17:33 |
Pierre Bricault | | | | Maintenance | | Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
|
|
1
|
Monday, March 28, 2011, 12:40 |
John Wong | | | | | Under Construction | Evaporator #2 is still under construction.
For further information please contact Jens
Lassen. |
|