Entry  Thursday, June 04, 2015, 11:10, Laura Lambert, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
    Reply  Friday, June 05, 2015, 12:19, John Wong, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
       Reply  Friday, June 05, 2015, 13:22, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx IMG_20150608_145926159.jpgIMG_20150608_145950384.jpg
          Reply  Wednesday, June 10, 2015, 12:15, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
             Reply  Friday, June 12, 2015, 14:59, Laura Lambert, Empty, 40860-1, LP-IG-LIS, In progress, Sintering TaC coating container for UCx 
                Reply  Friday, June 12, 2015, 16:08, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Re-Sintering TaC coating container for UCx 
                   Reply  Sunday, June 14, 2015, 09:40, John Wong, Empty, 40860-1, LP-IG-LIS, Done, Re-Sintering TaC coating container for UCx 2coats.png
Message ID: 208     Entry time: Friday, June 05, 2015, 12:19     In reply to: 207     Reply to this: 209
Author: John Wong 
Target Material: Empty 
Target Oven W.O#:  
Source: LP-IG-LIS 
Status: In progress 
Subject: Sintering TaC coating container for UCx 

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 