Entry  Thursday, December 07, 2017, 10:03, Laura Lambert, Endcaps, , TARGET BOAT, In progress, Sintering TaC coating on endcaps and springs 
    Reply  Thursday, December 07, 2017, 11:56, Laura Lambert, Endcaps, , TARGET BOAT, Problems, Sintering TaC coating on endcaps and springs trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG
       Reply  Friday, December 08, 2017, 15:29, Laura Lambert, Endcaps, , TARGET BOAT, Problems resolved, Sintering TaC coating on endcaps and springs 
          Reply  Friday, December 08, 2017, 15:42, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on endcaps and springs 
Message ID: 398     Entry time: Friday, December 08, 2017, 15:42     In reply to: 397
Author: Laura Lambert 
Target Material: Endcaps 
Target Oven W.O#:  
Source: TARGET BOAT 
Status: Done 
Subject: Sintering TaC coating on endcaps and springs 

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

 Friday, December 08, 2017, 15:29

Interlocks have been updated.

TGHT should now run up to 500mTorr before tripping off.


 

Friday, December 08, 2017, 15:41

IGP1 = 2.8e-7 Torr

IGP2 = 1.9e-7 Torr

Tapped up manually to 50A

Initiated auto-ramp at a rate of 0.2A/min up to 300A.

Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.


 Monday, December 11, 2017, 09:37

IGP1 = 2.4e-7

TGHT = 300A, 4.80V

OMEGA = 1175C

Tapping up manually...


 Monday, December 11, 2017, 14:19

Tapped up manually to 1800C

IGP1 = 2.1e-6 Torr

IGP2 = 2.1e-6 Torr

TGHT = 545A, 9.90V

OMEGA = 1810C

Will remain at max setpoints overnight and cool down in the a.m.


 Tuesday, December 12, 2017, 09:01

TGHT = 545A, 9.96V

OMEGA = 1833C

Remained at max setpoints for ~18hrs

IGP1 = 4.2e-7 Torr

IGP2 = 3.9e-7 Torr

Initiating auto-cool at 2.0A/min


 Wednesday, December 13, 2017, 11:05

Vented in air and removed from evap2 this morning.


 