Message ID: 519     Entry time: Wednesday, October 21, 2020, 14:39
Author: Aaron Schmidt 
Target Material: Nb 
Target Oven W.O#: 44508-2 
Source: LP-SIS 
Status: In progress 
Subject: Conditioning Nb#9 

 Nb#9 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density =  7.24 g/cm3

Target length = 3.5 cm

Total Mass = 25.343 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  425 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

End caps installed (not yet expanded). No Ta foil heat shield added.


Final desired temperature = 1900C.

OMEGA slope = 0.98.

Wednesday, October 21, 2020, 14:09: Roughing. 

Wednesday, October 21, 2020, 14:32: Turbo pump on. 

Wednesday, October 21, 2020, 15:29: Waterlines opened. Vacuum ok @ 1.05E-05T. 

Wednesday, October 21, 2020, 15:30: TGHT / TBHT PS on. Slope Set.

Wednesday, October 21, 2020, 19:06: Auto-ramping TGHT / TBHT to 300 / 100 @ 1 A per min. Vacuum @ 1.85e-06T.


Thursday, October 22, 2020, 07:26: Auto-ramping TGHT / TBHT to 500 / 200 @ 2 A per min. Vacuum @ 7.61e-07T.

Thursday, October 22, 2020, 11:28: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min. Vacuum @ 1.53e-06T. The Omega IR2C is back. Temp @ 1576 deg C.

Thursday, October 22, 2020, 12:22: Auto-ramping TGHT to 625 A @ 2 A per min. Vacuum @ 2.47e-06T. Temp @ 1734 C.  

Thursday, October 22, 2020, 12:48: Auto-ramping TGHT to 645 A @ 2 A per min. Vacuum @ 3.11e-06T. Temp @ 1815 C.   

Thursday, October 22, 2020, 13:10: Auto-ramping TGHT to 660 A @ 2 A per min. Vacuum @ 3.39e-06T. Temp @ 1851 C.  

Thursday, October 22, 2020, 13:25: Manually tap up TGHT until 1900 C. Vacuum @ 3.53e-06T.

Thursday, October 22, 2020, 13:30: TGHT @ 673 A. Temp @ 1903 C. Vacuum @  3.79e-06T.

Thursday, October 22, 2020, 14:00: Auto-cooling @ 1 A per min. 


Friday, October 23, 2020, 07:50: PS off. Turbo pump off. Purge waterline. 

Friday, October 23, 2020, 09:02: Venting. 