Entry  Tuesday, August 05, 2014, 13:13, Laura Lambert, Empty, , TARGET BOAT, In progress, Sintering TaC coated end caps aug5-2014.jpg
    Reply  Tuesday, August 05, 2014, 17:20, John Wong, , , TARGET BOAT, In progress, Sintering TaC coated end caps 
       Reply  Thursday, August 07, 2014, 10:13, Laura Lambert, , , TARGET BOAT, Failed, Sintering TaC coated end caps 
Message ID: 151     Entry time: Tuesday, August 05, 2014, 17:20     In reply to: 150     Reply to this: 153
Author: John Wong 
Target Material:  
Target Oven W.O#:  
Source: TARGET BOAT 
Status: In progress 
Subject: Sintering TaC coated end caps 

Laura Lambert wrote:

 Tuesday, August 05, 2014, 12:02

The target container end caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically, wrapped in graphite foil with 3 x Ta-heat shield. [see attached photo]

The chamber is currently being pumped down.


 

 Tuesday, August 05, 2014, 17:19

HS water valve opened; no leaks detected. 

Pressure @ 2.5e-6 Torr.

Ramping up TGHT to 580A @ 1A/min.


 