Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 583     Entry time: Monday, June 20, 2022, 14:52
Author: Darwin Ortiz Rosales 
Target Material: Empty 
Target Oven W.O#:  
Source:  
Status: Done 
Subject: softstart of new TP 

Monday, June 20, 2022, 14:50

A new Turbo pump was installed this morning and it was soft started.  It has operated correctly and it is ready for use.  Derek O.  installed it.

Previous pump had issues at start-up and was diagnosed as finished by Edi/

 

ELOG V2.9.2-2455