Message ID: 655     Entry time: Wednesday, February 21, 2024, 06:23
Author: Darwin Ortiz Rosales 
Target Material: TiC 
Target Oven W.O#:  
Source: LP TUBE 
Status: Done 
Subject: 240220TiC conditioning 

Wednesday, February 21, 2024, 06:22

Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with 201 D shaped discs in a 12mm graphite cartridge with usable 11mm

conditioning tube WO = 44692-13

End-caps on the graphite cartridge have holes for outgassing.  One spring each end in the Ta container

initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT

OMEGA slope = 0.99

Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr


Wednesday, February 21, 2024, 09:12

IGP1 initial = 9e-07 Torr

Starte at 3A/min to 90A


Wednesday, February 21, 2024, 09:21

increased autoramp to 4 A/min until pressure starts rising, then will slow down or pause


Wednesday, February 21, 2024, 09:32

At 74A, paused.  Will continue at 2A/min TGHT


Wednesday, February 21, 2024, 09:40

Pausing at 87A. 


Wednesday, February 21, 2024, 10:34

pressure dropping.  restarting ramp up to 120A at 2A/min


Wednesday, February 21, 2024, 10:37

From previous TiC 220206, will heat up fast until 250A and then at 1A/min until 300A to better resolve out-gassing profile


Wednesday, February 21, 2024, 12:05

Changed ramp to 1A/min to 300A


Wednesday, February 21, 2024, 13:10

Manually ramped up for a while

increased ramp speed to 2A/min

regression line started to match previous one after 1300C


Wednesday, February 21, 2024, 13:16

increased ramp rate to 4A/min to 420A


Wednesday, February 21, 2024, 13:37

Note: the temperature became unrealistic.  suspect window condensate.  Will use regression and to to 441A


Wednesday, February 21, 2024, 13:54

reached 441A, 7.6V

leaving for 3.5 hours or when pressure drops to 2-3 e-06 Torr


Wednesday, February 21, 2024, 18:56

IGP1=2.9e-06 Torr

starting rampdown at -2A/min