Monday, July 22, 2013, 15:00
Target container is coated with TaC - this container will be used for UCx#7.
Container is wrapped with 3 layers of Ta, including the back-block.
For the sintering process:
TGHT will be ramped up to 580A at 0.2A/min
TBHT will be ramped up to 230A at 0.2A/min.
Chamber has been pumped down. HS cooling H2O valves are opened, and no leaks are detected.
Currently IGP1 @ 7.03e-6 Torr.
Monday, July 22, 2013, 15:19
TGHT/TBHT was stepped up to 20A. Pressure increased to ~1.2e-5 Torr.
Auto-ramping initiated...
Wednesday, July 24, 2013, 18:40
TGHT and TBHT have reached to 580A/230A, respectively. Target has been heated for ~4 hours at that max current.
Vacuum currently at 1.65e-6 Torr.
Auto-cooling initiated... (TGHT @ -1A/min, TBHT -0.5A/min)
Target will be vented in air tomorrow.
|