Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 415     Entry time: Wednesday, July 25, 2018, 17:33
Author: John Wong 
Target Material: Empty 
Target Oven W.O#: 43044-2 
Source: LP-SIS 
Status: Done 
Subject: TaC coating/sintering for UCx#24 

Wednesday, July 25, 2018, 17:32

Container is coated with TaC and wrapped with 3 layers of Ta heat-shields.

Desired sintering temperature ~1900 C, TGHT is estimated to be ~ 445A (3.3 kW), TBHT set to 230A (as usual).

OMEGA slope set to 0.99

Good vac = 3.0 e-5 Torr, Bad vac = 5.0 e-5 Torr.

Chamber is currently being pumped down.


 Friday, July 27, 2018, 10:32

Vacuum at 9.9 e-7 Torr. 

Autoramp TGHT at 1A/min to 300A and TBHT at 1A/min to 230A. Will monitor temp and adjust TGHT to reach the desire temp.


 Friday, July 27, 2018, 16:31

TGHT reached to 1500 C, and TBHT at 230A, Temp at 1480 C, pressure at 2.e-6 Torr.

Autoramp TGHt at 1A/min to 400A.  Continue monitoring temp.


 Saturday, July 28, 2018, 12:41

TGHT at 400A/6.2V. Temp at 1730 C.  Pressure 7.4 e-7 Torr.

Tapped up TGHT to 450A/7.2V, temp at 1891 C. Holding at this current... Pressure coming down from 1.2e-6 Torr.


 Monday, July 30, 2018, 22:40

Target temp has been held at 1880 C, TGHT at 450A/7.57V, TBHT 230/4.18V, vaccum at 3.8 e-7 Torr. 

Cooling TGHT and TBHT at 2A/min and 1A/min, respectively. 


 Tuesday, July 31, 2018, 10:23

TGHT/TBHT at 0A.  Pressure at 1.5e-7 Torr. 

Process completed. 

Venting chamber.

Target containers looks good.  Transferred to Ar glovebox.


 

ELOG V2.9.2-2455