Subject: Window shutter added 

 Tuesday, September 12, 2017, 12:00:

The coated back window was changed to a shuttered window.

On star-point flange bolt interfered with the shutter, however it was removed, shortened, and re-installed.

The installation is complete. Awaiting roughing pump to leak check.