Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 635     Entry time: Monday, June 05, 2023, 14:52
Author: Aaron Schmidt 
Target Material:  
Target Oven W.O#:  
Source:  
Status:  
Subject: Swapped turbo pumps. 

 Previous TP would only spin up to 4KRPM. New TP installed.

Monday, June 05, 2023, 14:50: Roughing. 

Monday, June 05, 2023, 15:10: Controller reset. TP on. 

ELOG V2.9.2-2455