Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 531     Entry time: Friday, February 26, 2021, 09:28
Author: Ferran Boix Pamies 
Target Material: Empty 
Target Oven W.O#: none 
Source:  
Status: Done 
Subject: Parasitic target thermal tests 

 Tests were performed with external power supply. No target boat or container.

Small power on heating small heating elements on parasitic target attached on isac heatshield with water cooling on. 

 

 

ELOG V2.9.2-2455