Message ID: 654     Entry time: Wednesday, February 07, 2024, 22:49
Author: Darwin Ortiz Rosales 
Target Material: TiC 
Target Oven W.O#: 44692-11 
Source: LP TUBE 
Status: Done 
Subject: 240206TiC conditioning 

Wednesday, February 07, 2024, 22:36

Ta container tube TaC coated, wrapped in 4 Ta foil heat-shields, and loaded with 320 D shaped discs in a 12mm graphite cartridge with usable 11mm

Endcaps on the graphite cartridge have holes for outgassing

initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT

OMEGA slope = 0.99

Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr


Thursday, February 08, 2024, 06:18

Starting heat ramp tght

initial pressure = 8.1e-07 Torr IGP1


Thursday, February 08, 2024, 06:54

start of gasoff observed. paused ramp and will continue at 1A/min


Thursday, February 08, 2024, 07:24

lowered TGHT current to 75 A as pressure increasing too rapidly.  will leave at this current until pressure drops


Thursday, February 08, 2024, 09:11

continuing ramp to 120A on TGHT


Thursday, February 08, 2024, 09:24

Increasing ramp to 2A/min to 250A on TGHT


Thursday, February 08, 2024, 10:52

Increased ramp to 3A/min to 250A on TGHT


Thursday, February 08, 2024, 11:10

Everything looks good will continue to 300 A at 3A/min TGHT


Thursday, February 08, 2024, 11:33

Pausing heating at 285A, 4.8V TGHT

OMEGA reads 1430C

Will let pressure drop and then proceed ramping slowly @ 0.2A/min


Thursday, February 08, 2024, 13:53

IGP1= 2.4e-06 Torr

OMEGA = 1432 C

ramp at 0.2A/min towards 1550C


Thursday, February 08, 2024, 14:07

pressure very stable.  will increase to 0.4 A/min


Thursday, February 08, 2024, 15:24

increasing ramp rate to 1A/min

IGP1 = 2.5e-06 Torr


Thursday, February 08, 2024, 18:05

1900 C on OMEGA

will leave 3-4 hours depending on pressure



Thursday, February 08, 2024, 21:10

No additional pressure peaks observed and pressure on IGP1=  1.9e-06 Torr

TGHT= 460 A, 8.1V

OMEGA= 1860 C

ramp down at -2A/min

 

 

 