Message ID: 2     Entry time: Thursday, July 21, 2011, 17:33
Author: Pierre Bricault 
Target Material:  
Target Oven W.O#:  
Source:  
Status: Maintenance 
Subject:  
Rick mentioned to me that the evaporator is ready for the next steps of the commissioning process.
In the chamber only the target leg heaters have current by-pass clamps on them. 
The ionizer tube heaters do not have them because these lines do not have the same configuration as the others. The current by-pass clamps will 
not fit these lines.

We may not need this for the commissioning, Rick will design and manufacture something  for this when I get back from holiday.

The water is on in all circuits except for the power supply cooling circuit.

Pierre