Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 690     Entry time: Friday, April 11, 2025, 10:44
Author: Darwin Ortiz Rosales 
Target Material: TiC 
Target Oven W.O#: TiC250304 
Source: LP TUBE 
Status: In progress 
Subject: TiC  

 

Friday, April 11, 2025, 06:18

 

 initial IPG1=2.3 e=06 Torr

Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with _________ D shaped discs in a 12mm graphite cartridge with usable 11mm

conditioning tube WO = 41882-4

End-caps on the graphite cartridge have holes for outgassing.  One spring each end in the Ta container

initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT

OMEGA slope = 0.99

Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr


Friday, April 11, 2025, 14:45

reached 1800 C on OMEGA at 398A readback

Will take to ~410 A and leave for 4 hours


Friday, April 11, 2025, 18:55

at 415A OMEGA was 1879 C

was left for 4 hours at this setting

starting rampdown at -2A/min

 

ELOG V2.9.2-2455