Leak noted on previous TaC sintering on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line a re-tightened.
Monday, November 25, 2019, 11:31: Roughing.
Monday, November 25, 2019, 11:42: Turbo pump on.
Monday, November 25, 2019, 13:38: Vacuum @ 7.29e-06T.
Monday, November 25, 2019, 13:42: Waterlines opened. Vacuum slowly climbed to 7.57e-06T. Waterlines closed / purged.
Monday, November 25, 2019, 13:47: Vacuum @ 6.83e-06T.
Monday, November 25, 2019, 13:50: Waterlines opened. Vacuum gradually climbed again. Waterlines closed / purged.
Monday, November 25, 2019, 13:51: Turbo pump off.
Monday, November 25, 2019, 14:41: Vent. Check seals (All on HS line).
Monday, November 25, 2019, 14:48: Roughing.
Monday, November 25, 2019, 15:06: Vacuum @ 1.22e-04T. Waterlines opened. Vacuum continued to pump down steadily to 8.86e-05T and dropping.
Monday, November 25, 2019, 15:07: Turbo pump off. |