The coated container was wrapped in 4 Ta foil heatshield and left in evap2 over night to attain vacuum.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230 A
Final TGHT current= ~700A (adjustable)
Heating autoramp starged at 1A/min on TGHT and TBHT to 120A
Then at 2 A/min to =400 A TGHT and 230A TBHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Initial IGP1= 5.7e-05 Torr
Friday, January 26, 2024, 09:20
Pressure starts increasing at 125 A on TGHT and TBHT. Leaving it to equilibrate then will start ramping at 3A/min (1.5A/30s) to 700A on TGHT and 230A on TBHT
Friday, January 26, 2024, 13:18
leave sintering at 1838C . Will start rampdown at 5 pm.
IGP1= 6.10e-06 Torr
TGHT=680A, 10.14V
TBHT = 230A, 3.13V
Friday, January 26, 2024, 16:52
IGP1 = 3.0e10-6 Torr
OMEGA=1821 C
start rampdown @-2A/min TGHT and -1A/min TBHT |