Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 391     Entry time: Monday, November 06, 2017, 18:25
Author: John Wong 
Target Material: np-SiC 
Target Oven W.O#:  
Source: TARGET BOAT 
Status: Done 
Subject: Thermal treatment npSiC Horn vs Probe samples - P74 

Monday, November 06, 2017, 18:21

Samples of Horn and Probe - npSiC. see pg 74.

6 samples in total, to be heated to 1550C, about 450A.  Set ramping rate at 0.2A/min.  

Chamber pumping down


 Tuesday, November 07, 2017, 15:01

TGHT reached to 450A/8.2V, temperature measured at 1460C.  See attachment 1.

Increased ramping to 480A, targeting 1550C.


 Tuesday, November 07, 2017, 22:26

Samples have been heating at 1550C with TGHT at 480A/8.78V for about 8 hours.

Vacuum stabilizes at 8.4e-7 Torr.

Initial cooling at 2A/min.


 Wednesday, November 08, 2017, 10:36

Venting chamber.


 

Attachment 1: Capture1.JPG  189 kB  Uploaded Tuesday, November 07, 2017, 15:04  | Show | Hide all
ELOG V2.9.2-2455