Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
OMEGA slope= 0.990
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 150 A. Then autoramp TGHT to 675A and TBHT to 230A.1
Wednesday, June 29, 2022, 10:13
Chamber isolation performed and no change of pressure observed.
Water leak test performed and no pressure change detected.
Starting ramp up
Wednesday, June 29, 2022, 13:23
Ramping to 675A on TGHT and 230A on TBHT @ 2A/min
Ramped TGHT to 680A, 10.6V and held for 4 hours
Wednesday, June 29, 2022, 21:52
Started rampdown @-2A/min TGHT and -1A/min TBHT |