Ta#67 Thin foil LP-SIS target description:
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Foil Thickness = 0.010mm (0.0004") avg Measured.
Target material batch: https://elog.triumf.ca/TIS/Target+Production/143
Target density = 4.498 g/cm3
Target length = 3.7465 cm
Total Mass = 16.8509 g [Incl foils + Ta wire on 2 packs]
Total mass w/ Target oven = 415g (No end caps)
Discs in target are arranged as follows: 2packs
Dimpling direction on foils/ Packs. --> Center <--
No Ta foil heat shield added
Monday, July 22, 2024, 14:53: Roughing.
Halt roughing. Install heat plates.
Monday, July 22, 2024, 15:06: Roughing.
Monday, July 22, 2024, 15:26: TP On.
Monday, July 22, 2024, 15:34: TP Timeout. Restart.
Monday, July 22, 2024, 15:35: TP at speed (Green)
Monday, July 22, 2024, 15:36: PS On. TGHT / TBHT to 5/5 A manually. OK. Tap down.
Tuesday, July 23, 2024, 07:03: Auto-ramping TGHT / TBHT to 120 / 60 A @ 2 A per min. Desired temperature 1900 C.
Tuesday, July 23, 2024, 08:02: OMEGA IR2C Laser off. Slope set to 0.98.
Tuesday, July 23, 2024, 08:06: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Tuesday, July 23, 2024, 09:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min. Temperature @ 1022 C.
Tuesday, July 23, 2024, 11:59: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. Temperature @ 1538 C.
Tuesday, July 23, 2024, 12:46: TGHT / TBHT @ 580 / 230 A (569 / 233 A). Temperature @ 1710 C. Vacuum @ 7.44e-06T.
Tuesday, July 23, 2024, 14:23: TGHT / TBHT @ 580 / 230 A (568 / 233 A). Auto-ramping TGHT to 620 A @ 2 A per min. Temperature @ 1721 C. Vacuum @ 5.06e-06T.
Tuesday, July 23, 2024, 14:48: TGHT / TBHT @ 620 / 230 A 609 / 233 A). Auto-ramping TGHT to 630 A @ 2 A per min. Temperature @ 1799 C. Vacuum @ 6.76e-06T.
Tuesday, July 23, 2024, 14:56: TGHT / TBHT @ 630 / 230 A 618 / 233 A). Temperature @ 1816 C. Vacuum @ 7.14e-06T. Tapping up manually TGHT to get to 1900degC
Tuesday, July 23, 2024, 15:23: TGHT / TBHT @ 670 / 230 A 657 / 233 A). Temperature @ 1890 C. Vacuum @ 9.94e-06T. Stopping and waiting for 5min.
Tuesday, July 23, 2024, 15:39: Target ramp down 2A/min to 0 both TGHT and TBHT.
Wednesday, July 24, 2024, 08:50: TP off.
Wednesday, July 24, 2024, 09:18: Venting.
Wednesday, July 24, 2024, 10:28: Target removed. EVAP2 clear. |