  Evaporator_2  Not logged in ELOG logo
Message ID: 467     Entry time: Thursday, November 21, 2019, 08:10
Author: Aaron Schmidt 
Target Material: SiC 
Target Oven W.O#:  
Source: HP-FEBIAD 
Status: In progress 
Subject: Temperature mapping. 

 Thursday, November 21, 2019, 08:09: PS on. Leak issue resolved (Evap 2 Elog 466). Vacuum @ 4.10e-07T.

Thursday, November 21, 2019, 08:15: Auto-ramping TGHT / TBHT @ 2 A per min to 300 / 150 A. 