Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 345     Entry time: Monday, February 06, 2017, 11:17
Author: Anders Mjos 
Target Material:  
Target Oven W.O#:  
Source:  
Status: Problems resolved 
Subject: IOC restart after power outagae 

 Dave Morris did a remote restart of the IOC after the outage. Turbo pump started.

ELOG V2.9.2-2455