  Evaporator_2  Not logged in ELOG logo
Message ID: 427     Entry time: Friday, January 18, 2019, 15:11
Author: Darwin Ortiz Rosales 
Target Material: Empty 
Target Oven W.O#: 43044-5 
Source: LP-SIS 
Status: Done 
Subject: TaC coating/sintering (training/online use)  

Friday, January 18, 2019, 15:00

Container was coated with TaC and wrapped with 3 Ta heat shields.

Desired temp = 1900 C, Omega slope set = 0.990, Auto ramping TGHT at 1A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230A (max). TBHT at 1A/min to reach 230A.

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down.  Sintering will proceed next week.


 Monday, January 21, 2019, 10:17

Current pressure at IGP1 = 1.31e-7 Torr

Manual tapping to 50A on TBHT and TGHT

TBHT 38.75A, 0.41V

TGHT 37.5A, 0.07V

waiting for pressure to stabilize.

pressure  IGP1 8.0 e-7 Torr

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Tuesday, January 22, 2019, 09:34

TGHT reached 400A , 1800 C, however temperature dropped to 1785 C.

TGHT increased to 444A manually.  Temperature stabilized at 1880 C.  

After 10 hours, TGHT was ramped down @ 2A/min and TBHT @1A/min

Tuesday, January 22, 2019, 14:36: Evap 2 PS off. Turbo off (Around 14:10) Vented Evap 2 and removed the target container with Darwin. - AS.  

 

 