Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 547     Entry time: Tuesday, April 13, 2021, 10:44
Author: Marla Cervantes 
Target Material: Empty 
Target Oven W.O#: NA (Ta- tube Eagle Alloys) 
Source:  
Status: Done 
Subject: Re-coat 4 

 Tuesday, April 13, 2021, 09:51

IGP1 = 2.5e-7 Torr


Tuesday, April 13, 2021, 10:17 

The wire was heated in the same manner as the last three runs

From 0A to 7A the autoramp was set to 0.5A/min

At 8A the wire started the glow dimmly 

Above 8A, the wire was heated manually at 0.5A until 15A where the step was changed to 1A, 

the temperature was measured with the filament pyrometer every 2 A starting at 10A

At 42 A the step was changed to 0.5A until 44.5A, 4.61V (2120 °C), the wire was kept at that temperature for 6 hours.

After that time, the current was ramped to 0A at 0.5A/min.

Attachment 1: voltage-increment-Re-coating.JPG  85 kB  Uploaded Thursday, April 15, 2021, 09:30  | Show | Hide all
ELOG V2.9.2-2455