  Evaporator_2  Not logged in ELOG logo
Message ID: 36     Entry time: Thursday, July 19, 2012, 17:05
Author: John Wong 
Target Material: Empty 
Target Oven W.O#: 37918-3 
Source: LP-FEBIAD 
Status: Done 
Subject: Coating target oven /w TaC & sintering for UCx#5  

Thursday, July 19, 2012, 16:58

The target container was coated with TaC. 

It's wrapped with 3 layers of Ta as the heat-shield, including the backblock.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Currently, IGP1 = 1.5e-6 Torr.  BP = 15mTorr


 Friday, July 20, 2012, 13:56

TGHT and TBHT reached to 580A & 230A, respectively, and stayed for ~ 2hrs. 

Measured temperature at the ionizer tube to be 1630C.

Cooling down in process at 2A/min...


 Sunday, July 22, 2012, 20:53

The chamber was vented earlier around 14:00hr.  

The target container looks good! 


 