Thursday, July 19, 2012, 16:58
The target container was coated with TaC.
It's wrapped with 3 layers of Ta as the heat-shield, including the backblock.
TGHT will be ramped up to 580A at 0.2A/min.
TBHT will be ramped up to 230A at 0.2A/min.
Currently, IGP1 = 1.5e-6 Torr. BP = 15mTorr
Friday, July 20, 2012, 13:56
TGHT and TBHT reached to 580A & 230A, respectively, and stayed for ~ 2hrs.
Measured temperature at the ionizer tube to be 1630C.
Cooling down in process at 2A/min...
Sunday, July 22, 2012, 20:53
The chamber was vented earlier around 14:00hr.
The target container looks good!
|