Message ID: 659     Entry time: Friday, April 26, 2024, 06:19
Author: Darwin Ortiz Rosales 
Target Material: TaC 
Target Oven W.O#: 45447-29 
Source: HP-SIS 
Status: Done 
Subject: TaC coating sintering 

 Monday, April 29, 2024, 19:50

Started coating with coating stand.

The coated container was wrapped in 3 Ta foil heatshields.

Vacuum IGP1 initial =9.1 e-07 Torr

Target temperature on OMEGA= 1850-1900 C

OMEGA slope:= 0.990

Target time at max temperature = 4 hours

Final Current TBHT= 230 A

Final TGHT current= ~700A (adjustable)

Heating autoramp starged at 2A/min(1A/30s) on  TGHT  100A

Then at 2A/min  to =700 A TGHT and 230A TBHT

Good vacuum = 5.0 e-04 Torr

Bad vacuum = 5.0E-02 Torr


Monday, April 29, 2024, 20:25

Reached 1810 @700A

Will leave until 1230am