John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Nikita Bernier wrote: |
John Wong wrote: |
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down.
|
Friday, May 18, 2012, 12:19
The target is wrapped with only one heat shield.
Evaporator #2 Target Heater is now auto-ramping at 0.5 A/min, up to 820 A, with the maximum voltage limited at 2 V, between 2.00e-05 (Good vacuum) and 3.00e-05 Torr (Bad vacuum). Tube Heater is auto-ramping at 0.5 A/min, up to 230 A, with the maximum voltage limited at 1 V. See attachments.
|
Friday, May 18, 2012, 13:15
Increased TBHT voltage to 5V, and TGHT to 15V. Currently, TBHT =83A, 0.986V, TGHT= 144A, 1.65V, IGP1 = 5.2e-7 Torr, IGP2 = 4.3e-7 Torr.
Continue ramping up...
Tuesday, May 22, 2012, 12:02
TGHT and TBHT were ramped up to 830A/13.65V (local), and 235A/3.85V, respectively. The target was conditioned over the long weekend.
|
Tuesday, May 22, 2012, 12:13
Initiating the cool-down process at 5 A/min.
See archive plots of the Target Heater (Attachment 1) and the Tube Heater (Attachment 2).
|
Tuesday, May 22, 2012, 15:24
TGHT/TBHT were ramped down to 0A. The target has cooled for about 45 min. All pumps and chillers are off. The chamber has been vented.
|
Monday, June 11, 2012, 12:20
After the re-conditioning, the target's end-caps vaporized. This is something happened before (see elog entries below):
https://elog.triumf.ca/TIS/Evaporator_1/20
https://elog.triumf.ca/TIS/Evaporator_1/22
The caps were removed and yellow crystals were observed. (see attachment#1).
The D-caps will be inserted in both ends and will be re-conditioned again to see if the yellow crystals can be removed at high temperature.
|