2020-10-09 9:48 The target was installed the day before and left pumping over night. IGP1=4.7e-7Torr. leak check when water on, ok. Setting ramp up
2020-10-09 10:16 Ramping up the target to 50A, 1.5A/30s. All good. Going to 200A same rate.
2020-10-09 11:11 Target at 200A. Pyrometer 1170degC. ramping to 300A same rate.
2020-10-09 11:51 Target at 300A. Pyr. 1510. Ramping to 400A same rate.
2020-10-09 12:27 Target at 400A. Pyr. 1820. Ramping to 500A same rate.
2020-10-09 13:01 Target at 500A. Pyr. 2100. Ramping down to 0A 2A/30s. |