Monday, March 19, 2012, 17:10, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets
|
Tuesday, March 20, 2012, 14:39, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets
|
Thursday, March 22, 2012, 00:34, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets
|
Thursday, March 22, 2012, 17:56, Nikita Bernier, BeO, Target boat #1, , Done, Sintering BeO pellets
|
|
Monday, March 19, 2012, 17:04
Target boat contains 4 BeO pellets with 30% PVB:
Sample, Thickness (mm), Mass (g), Density (g/cm3)
1 4.943, 0.9628, 1.265
2 4.930, 0.9685, 1.276
3 4.758, 0.9607, 1.312
4 4.979, 0.9872, 1.288
Target chamber is currently being pumped down. Leak check will be done tomorrow by turning on the cooling water for the heat shield.
Wednesday, March 21, 2012, 18:30
The Evaporator #2 backing pump (IEVAP2BP1) muffler has been connected to the exhaust system.
The auto-ramp program has been tested today and works well.
Evaporator #2 is now auto-ramping overnight at 1 A/min, up to 500 A, between 5.00e-05 and 6.00e-05 Torr.
ISAC ops have been informed of the process and they will include it in their walkaround. |